2025 Energy Code · Climate Zone 11

Title 24 Climate Zone 11: ADU Requirements

What the 2025 California Energy Code's prescriptive package requires for a new detached ADU in Climate Zone 11, and how those requirements change the MEP design.

Order MEP Plans + Title 24 About Title 24 reports

Where Climate Zone 11 is

Of the California places we cover, 26 are mostly in Climate Zone 11, across 7 counties: Butte County, Nevada County, Placer County, Shasta County, Sutter County, Tehama County, Yuba County. Together they issued 1,125 ADU building permits from 2021 through 2025. Zones follow ZIP-code boundaries, so we confirm the zone from the project address before running the Title 24 report.

2025 prescriptive requirements for a new detached ADU

For a new detached ADU in Climate Zone 11, the 2025 prescriptive package sets these zone-specific targets.

WindowsU-factor 0.27 or lower; SHGC 0.23 or lower; total area up to 20% of floor area (west-facing up to 5%)
Attic, high-performance optionR-38 ceiling; below roof deck: R-19
Attic, ducts-inside optionR-38 ceiling plus radiant barrier; ducts and air handler in conditioned space
Framed wallsAssembly U-factor 0.048 or lower
Cool roofRequired: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
Whole-house fanRequired, 1.5 cfm per sq ft of floor area (units of 500 sq ft or less exempt)
Space heating and coolingHeat pump (other systems through the performance approach)
Water heatingHeat pump water heater; units of 500 sq ft or less, or one bedroom or fewer, have simpler options
Solar PVkW = (floor area x 0.836) / 1000 + 1.44; none required under 1.8 kWdc (about 431 sq ft or smaller for a single ADU)

An attached ADU or a garage conversion is an addition under the Energy Code, not new construction, so it follows the addition requirements instead. Solar PV is not required for additions.

Design temperatures across Climate Zone 11

The zone sets the energy targets, but the HVAC is sized from the local design temperature, and that varies inside a zone. Among the places we cover here, the 1% summer design temperature ranges from 92°F in Nevada City to 103°F in Rocklin, and the coldest winter design temperature is 14°F in Nevada City. That spread is why we run a Manual J for each address instead of using a zone-wide rule of thumb.

Places in Climate Zone 11

PlaceCountyElectric utilityADU permits 2021–25
ChicoButtePacific Gas and Electric (PG&E)218
Granite Bay (unincorp.)PlacerPacific Gas and Electric (PG&E)131
RosevillePlacerRoseville Electric Utility128
AuburnPlacerPacific Gas and Electric (PG&E)105
ReddingShastaRedding Electric Utility77
RocklinPlacerPacific Gas and Electric (PG&E)76
LincolnPlacerPacific Gas and Electric (PG&E)46
LoomisPlacerPacific Gas and Electric (PG&E)46
Newcastle (unincorp.)PlacerPacific Gas and Electric (PG&E)33
Nevada CityNevadaPacific Gas and Electric (PG&E)32
Grass ValleyNevadaPacific Gas and Electric (PG&E)29
Penryn (unincorp.)PlacerPacific Gas and Electric (PG&E)29
Palo Cedro (unincorp.)ShastaPacific Gas and Electric (PG&E)25
Meadow Vista (unincorp.)PlacerPacific Gas and Electric (PG&E)22
Yuba CitySutterPacific Gas and Electric (PG&E)21
Olivehurst (unincorp.)YubaPacific Gas and Electric (PG&E)15
Durham (unincorp.)ButtePacific Gas and Electric (PG&E)14
OrovilleButtePacific Gas and Electric (PG&E)11
Shasta LakeShastaCity of Shasta Lake Electric Utility11
Red BluffTehamaPacific Gas and Electric (PG&E)11
Cottonwood (unincorp.)ShastaPacific Gas and Electric (PG&E)10
AndersonShastaPacific Gas and Electric (PG&E)9
Penn Valley (unincorp.)NevadaPacific Gas and Electric (PG&E)9
Shingletown (unincorp.)ShastaPacific Gas and Electric (PG&E)7
Sheridan (unincorp.)PlacerPacific Gas and Electric (PG&E)5
Plumas Lake (unincorp.)YubaPacific Gas and Electric (PG&E)5

Sources

Requirements shown are the 2025 prescriptive package (effective January 1, 2026) for newly constructed single-family buildings, which includes new detached ADUs. A performance (computer-modeled) approach can trade some items against others. Your Title 24 report confirms what applies to your project.

Need MEP plans and a Title 24 report in Climate Zone 11?

We prepare both from the same design, so the energy model and the equipment on the plans agree.

Start My Order