Unincorporated Placer County · Climate Zone 11

MEP Plans in Newcastle, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Newcastle (unincorporated Placer County), prepared for plan check at Placer County Building Services Division, with Title 24 available in the same order.

Start My Newcastle Order See Pricing

Newcastle project facts we design around

CountyPlacer County (unincorporated)
Title 24 climate zoneClimate Zone 11, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permits issued byPlacer County Building Services Division
ADU permits issued, 2021–202533
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Newcastle

Placer County issued 33 ADU building permits from 2021 through 2025 for addresses in Newcastle, based on the county's reports to the state. Permits went from 12 in 2021 to 4 in 2025.

20212022202320242025
129264

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 11

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.836) / 1000 + 1.44; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 431 sq ft or smaller.

Climate Zone 11 requirements in full →

HVAC design for Newcastle

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 11's Central Valley-style climate — hot summers, cool winters. Heat pump sized for cooling and verified for winter heating.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Granite Bay (unincorp.)CZ 11Pacific Gas and Electric (PG&E)131
RosevilleCZ 11Roseville Electric Utility128
AuburnCZ 11Pacific Gas and Electric (PG&E)105
RocklinCZ 11Pacific Gas and Electric (PG&E)76
LincolnCZ 11Pacific Gas and Electric (PG&E)46
LoomisCZ 11Pacific Gas and Electric (PG&E)46

Placer County → · All California cities and communities →

Ready for permit-ready MEP plans in Newcastle?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Newcastle; requirements vary by project. Confirm with Placer County Building Services Division.