ADU Electrical Guide
ADU Electrical Guide
What you need to know about electrical plans, panels, and loads for your California ADU.
From panel upgrades to EV conduit and load calculations, here's how ADU electrical requirements work.
What are the basic electrical requirements for any ADU in California?
What panel size does an ADU need?
How does a subpanel work for a detached ADU?
When is a separate utility service required instead of a subpanel?
How does California's all-electric mandate affect ADU electrical planning?
What is EV charging infrastructure and what does California require?
What is battery storage readiness (ESS-ready) and which ADUs need it?
What do I need to know about utility company coordination for ADU electrical?
What is the NEC Article 220 load calculation and what does it include?
What electrical code violations are most common in California ADU legalization (amnesty) cases?
This information is general guidance for California ADUs. Requirements vary by jurisdiction — confirm the specifics for your project with your local building department.
Related pages
Please note: The pricing shown reflects MEP Plans USA’s own current flat-rate pricing only and is not intended to represent average market, competitor, or public pricing. We’re proud to offer some of the best flat-rate MEP prices in California.
Ready to get permit-ready MEP plans?
Fast turnaround, city corrections included, and easy online checkout for California ADUs.
Start My Order