MEP Plans in Oroville, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Oroville, prepared for plan check at the City of Oroville building department, with Title 24 available in the same order.
Oroville project facts we design around
| County | Butte County |
|---|---|
| Title 24 climate zone | Climate Zone 11, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permit review | The City of Oroville building department |
| ADU permits issued, 2021–2025 | 11 (#392 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Oroville
Oroville issued 11 ADU building permits from 2021 through 2025, the 392nd most among the 450 California cities that reported ADU permits. Permits went from 4 in 2021 to 3 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 4 | 1 | 2 | 1 | 3 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 11
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.836) / 1000 + 1.44; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 431 sq ft or smaller.
Climate Zone 11 requirements in full →
HVAC design for Oroville
The California Energy Commission's design-day data for Oroville gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 102°F and a winter design temperature of 25°F.
| Summer design (1%) | 102°F dry bulb / 70°F wet bulb |
|---|---|
| Winter design (median of extremes) | 25°F |
| Daily temperature range | 37°F |
| Elevation | 300 ft |
Cooling governs equipment size here. At 102°F design conditions, west-facing glass, attic insulation and duct location move the load more than anything else, and the heat pump's electrical load has to be carried into the panel calculation.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Chico | CZ 11 | Pacific Gas and Electric (PG&E) | 218 |
| Durham (unincorp.) | CZ 11 | Pacific Gas and Electric (PG&E) | 14 |
| Forest Ranch (unincorp.) | CZ 16 | Pacific Gas and Electric (PG&E) | 6 |
| Magalia (unincorp.) | CZ 16 | Pacific Gas and Electric (PG&E) | 5 |
Guides for Oroville projects
Ready for permit-ready MEP plans in Oroville?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Oroville; requirements vary by project. Confirm with the City of Oroville building department.