MEP Plans in Rocklin, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Rocklin, prepared for plan check at the City of Rocklin building department, with Title 24 available in the same order.
Rocklin project facts we design around
| County | Placer County |
|---|---|
| Title 24 climate zone | Climate Zone 11, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permit review | The City of Rocklin building department |
| ADU permits issued, 2021–2025 | 76 (#258 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Rocklin
Rocklin issued 76 ADU building permits from 2021 through 2025, the 258th most among the 450 California cities that reported ADU permits. Permits went from 8 in 2021 to 18 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 8 | 20 | 15 | 15 | 18 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 11
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.836) / 1000 + 1.44; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 431 sq ft or smaller.
Climate Zone 11 requirements in full →
HVAC design for Rocklin
The California Energy Commission's design-day data for Rocklin gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 103°F and a winter design temperature of 20°F.
| Summer design (1%) | 103°F dry bulb / 70°F wet bulb |
|---|---|
| Winter design (median of extremes) | 20°F |
| Daily temperature range | 39°F |
| Elevation | 239 ft |
| Heating degree days | 3,143 |
Heating governs here. Choose a cold-climate heat pump that keeps its rated capacity near 20°F, and protect water lines and the water heater from freezing.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Granite Bay (unincorp.) | CZ 11 | Pacific Gas and Electric (PG&E) | 131 |
| Roseville | CZ 11 | Roseville Electric Utility | 128 |
| Auburn | CZ 11 | Pacific Gas and Electric (PG&E) | 105 |
| Lincoln | CZ 11 | Pacific Gas and Electric (PG&E) | 46 |
| Loomis | CZ 11 | Pacific Gas and Electric (PG&E) | 46 |
| Newcastle (unincorp.) | CZ 11 | Pacific Gas and Electric (PG&E) | 33 |
Guides for Rocklin projects
Ready for permit-ready MEP plans in Rocklin?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Rocklin; requirements vary by project. Confirm with the City of Rocklin building department.