MEP Plans in Olivehurst, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Olivehurst (unincorporated Yuba County), prepared for plan check at Yuba County Community Development – Building Department, with Title 24 available in the same order.
Olivehurst project facts we design around
| County | Yuba County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 11, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permits issued by | Yuba County Community Development – Building Department |
| ADU permits issued, 2021–2025 | 15 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Olivehurst
Yuba County issued 15 ADU building permits from 2021 through 2025 for addresses in Olivehurst, based on the county's reports to the state. Permits went from 5 in 2021 to 4 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 5 | not reported | 2 | 4 | 4 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 11
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.836) / 1000 + 1.44; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 431 sq ft or smaller.
Climate Zone 11 requirements in full →
HVAC design for Olivehurst
The California Energy Commission's design-day data for Olivehurst gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 101°F and a winter design temperature of 27°F.
| Summer design (1%) | 101°F dry bulb / 70°F wet bulb |
|---|---|
| Winter design (median of extremes) | 27°F |
| Daily temperature range | 36°F |
| Elevation | 64 ft |
| Heating degree days | 1,160 |
Cooling governs equipment size here. At 101°F design conditions, west-facing glass, attic insulation and duct location move the load more than anything else, and the heat pump's electrical load has to be carried into the panel calculation.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Plumas Lake (unincorp.) | CZ 11 | Pacific Gas and Electric (PG&E) | 5 |
| Concord | CZ 12 | Pacific Gas and Electric (PG&E) | 276 |
| Antioch | CZ 12 | Pacific Gas and Electric (PG&E) | 171 |
| Fairfield | CZ 12 | Pacific Gas and Electric (PG&E) | 79 |
| Sacramento | CZ 12 | Sacramento Municipal Utility District (SMUD) | 1,720 |
Guides for Olivehurst projects
Ready for permit-ready MEP plans in Olivehurst?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Olivehurst; requirements vary by project. Confirm with Yuba County Community Development – Building Department.