MEP Plans in Loomis, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Loomis, prepared for plan check at the City of Loomis building department, with Title 24 available in the same order.

Start My Loomis Order See Pricing

Loomis project facts we design around

CountyPlacer County
Title 24 climate zoneClimate Zone 11, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Loomis building department
ADU permits issued, 2021–202546 (#301 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Loomis

Loomis issued 46 ADU building permits from 2021 through 2025, the 301st most among the 450 California cities that reported ADU permits. Permits went from 9 in 2021 to 9 in 2025.

20212022202320242025
9107119

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 11

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.836) / 1000 + 1.44; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 431 sq ft or smaller.

Climate Zone 11 requirements in full →

HVAC design for Loomis

The California Energy Commission's design-day data for Loomis gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 102°F and a winter design temperature of 21°F.

Summer design (1%)102°F dry bulb / 70°F wet bulb
Winter design (median of extremes)21°F
Daily temperature range39°F
Elevation408 ft

Cooling governs equipment size here. At 102°F design conditions, west-facing glass, attic insulation and duct location move the load more than anything else, and the heat pump's electrical load has to be carried into the panel calculation.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Granite Bay (unincorp.)CZ 11Pacific Gas and Electric (PG&E)131
RosevilleCZ 11Roseville Electric Utility128
AuburnCZ 11Pacific Gas and Electric (PG&E)105
RocklinCZ 11Pacific Gas and Electric (PG&E)76
LincolnCZ 11Pacific Gas and Electric (PG&E)46
Newcastle (unincorp.)CZ 11Pacific Gas and Electric (PG&E)33

Placer County → · All California cities and communities →

Ready for permit-ready MEP plans in Loomis?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Loomis; requirements vary by project. Confirm with the City of Loomis building department.