2025 Energy Code · Climate Zone 4

Title 24 Climate Zone 4: ADU Requirements

What the 2025 California Energy Code's prescriptive package requires for a new detached ADU in Climate Zone 4, and how those requirements change the MEP design.

Order MEP Plans + Title 24 About Title 24 reports

Where Climate Zone 4 is

Of the California places we cover, 26 are mostly in Climate Zone 4, across 5 counties: Monterey County, San Benito County, San Luis Obispo County, San Mateo County, Santa Clara County. Together they issued 8,229 ADU building permits from 2021 through 2025. Zones follow ZIP-code boundaries, so we confirm the zone from the project address before running the Title 24 report.

2025 prescriptive requirements for a new detached ADU

For a new detached ADU in Climate Zone 4, the 2025 prescriptive package sets these zone-specific targets.

WindowsU-factor 0.27 or lower; SHGC 0.23 or lower; total area up to 20% of floor area (west-facing up to 5%)
Attic, high-performance optionR-38 ceiling; below roof deck: R-19
Attic, ducts-inside optionR-30 ceiling plus radiant barrier; ducts and air handler in conditioned space
Framed wallsAssembly U-factor 0.048 or lower
Cool roofNot required
Whole-house fanNot required
Space heating and coolingHeat pump (other systems through the performance approach)
Water heatingHeat pump water heater; units of 500 sq ft or less, or one bedroom or fewer, have simpler options
Solar PVkW = (floor area x 0.586) / 1000 + 1.21; none required under 1.8 kWdc (about 1,007 sq ft or smaller for a single ADU)

An attached ADU or a garage conversion is an addition under the Energy Code, not new construction, so it follows the addition requirements instead. Solar PV is not required for additions.

Design temperatures across Climate Zone 4

The zone sets the energy targets, but the HVAC is sized from the local design temperature, and that varies inside a zone. Among the places we cover here, the 1% summer design temperature ranges from 83°F in Palo Alto to 94°F in Paso Robles, and the coldest winter design temperature is 16°F in Paso Robles. That spread is why we run a Manual J for each address instead of using a zone-wide rule of thumb.

Places in Climate Zone 4

PlaceCountyElectric utilityADU permits 2021–25
San JoseSanta ClaraPacific Gas and Electric (PG&E)2,399
CampbellSanta ClaraPacific Gas and Electric (PG&E)1,097
Palo AltoSanta ClaraCity of Palo Alto Utilities723
Los GatosSanta ClaraPacific Gas and Electric (PG&E)450
SaratogaSanta ClaraPacific Gas and Electric (PG&E)387
Los AltosSanta ClaraPacific Gas and Electric (PG&E)384
Santa ClaraSanta ClaraSilicon Valley Power378
SunnyvaleSanta ClaraPacific Gas and Electric (PG&E)377
Mountain ViewSanta ClaraPacific Gas and Electric (PG&E)317
Los Altos HillsSanta ClaraPacific Gas and Electric (PG&E)277
MilpitasSanta ClaraPacific Gas and Electric (PG&E)229
CupertinoSanta ClaraPacific Gas and Electric (PG&E)191
East Palo AltoSan MateoPacific Gas and Electric (PG&E)164
GilroySanta ClaraPacific Gas and Electric (PG&E)162
Paso RoblesSan Luis ObispoPacific Gas and Electric (PG&E)108
AtascaderoSan Luis ObispoPacific Gas and Electric (PG&E)107
Morgan HillSanta ClaraPacific Gas and Electric (PG&E)103
GreenfieldMontereyPacific Gas and Electric (PG&E)88
HollisterSan BenitoPacific Gas and Electric (PG&E)74
Monte SerenoSanta ClaraPacific Gas and Electric (PG&E)67
King CityMontereyPacific Gas and Electric (PG&E)65
Templeton (unincorp.)San Luis ObispoPacific Gas and Electric (PG&E)33
San Martin (unincorp.)Santa ClaraPacific Gas and Electric (PG&E)18
San Miguel (unincorp.)San Luis ObispoPacific Gas and Electric (PG&E)16
San Juan BautistaSan BenitoPacific Gas and Electric (PG&E)10
Creston (unincorp.)San Luis ObispoPacific Gas and Electric (PG&E)5

Sources

Requirements shown are the 2025 prescriptive package (effective January 1, 2026) for newly constructed single-family buildings, which includes new detached ADUs. A performance (computer-modeled) approach can trade some items against others. Your Title 24 report confirms what applies to your project.