Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Greenfield, prepared for plan check at the City of Greenfield building department, with Title 24 available in the same order.
Greenfield project facts we design around
| County | Monterey County |
|---|---|
| Title 24 climate zone | Climate Zone 4, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permit review | The City of Greenfield building department |
| ADU permits issued, 2021–2025 | 88 (#235 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Greenfield
Greenfield issued 88 ADU building permits from 2021 through 2025, the 235th most among the 450 California cities that reported ADU permits. Permits went from 5 in 2021 to 38 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 5 | not reported | 22 | 23 | 38 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 4
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Solar PV sized by the CEC formula kW = (floor area x 0.586) / 1000 + 1.21; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,007 sq ft or smaller.
Climate Zone 4 requirements in full →
HVAC design for Greenfield
The California Energy Commission's design-day data for Greenfield gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 87°F and a winter design temperature of 22°F.
| Summer design (1%) | 87°F dry bulb / 65°F wet bulb |
|---|---|
| Winter design (median of extremes) | 22°F |
| Daily temperature range | 32°F |
| Elevation | 287 ft |
| Heating degree days | 1,020 |
Both seasons matter here. The heat pump is usually sized for the 87°F cooling condition and then checked to confirm it still covers the heating load at 22°F.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Salinas | CZ 3 | Pacific Gas and Electric (PG&E) | 865 |
| Monterey | CZ 3 | Pacific Gas and Electric (PG&E) | 446 |
| Pacific Grove | CZ 3 | Pacific Gas and Electric (PG&E) | 218 |
| Seaside | CZ 3 | Pacific Gas and Electric (PG&E) | 169 |
| Carmel-by-the-Sea | CZ 3 | Pacific Gas and Electric (PG&E) | 123 |
| Soledad | CZ 3 | Pacific Gas and Electric (PG&E) | 107 |
Guides for Greenfield projects
Ready for permit-ready MEP plans in Greenfield?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Greenfield; requirements vary by project. Confirm with the City of Greenfield building department.