Unincorporated Santa Clara County · Climate Zone 4

MEP Plans in San Martin, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in San Martin (unincorporated Santa Clara County), prepared for plan check at Santa Clara County Department of Planning and Development, with Title 24 available in the same order.

Start My San Martin Order See Pricing

San Martin project facts we design around

CountySanta Clara County (unincorporated)
Title 24 climate zoneClimate Zone 4, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permits issued bySanta Clara County Department of Planning and Development
ADU permits issued, 2021–202518
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in San Martin

Santa Clara County issued 18 ADU building permits from 2021 through 2025 for addresses in San Martin, based on the county's reports to the state. Permits went from 3 in 2021 to 5 in 2025.

20212022202320242025
34335

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 4

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.586) / 1000 + 1.21; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,007 sq ft or smaller.

Climate Zone 4 requirements in full →

HVAC design for San Martin

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 4's mild Bay Area climate. Load calculation on an older service before you assume a panel upgrade (or skip one).

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
San JoseCZ 4Pacific Gas and Electric (PG&E)2,399
CampbellCZ 4Pacific Gas and Electric (PG&E)1,097
Palo AltoCZ 4City of Palo Alto Utilities723
Los GatosCZ 4Pacific Gas and Electric (PG&E)450
SaratogaCZ 4Pacific Gas and Electric (PG&E)387
Los AltosCZ 4Pacific Gas and Electric (PG&E)384

Santa Clara County → · All California cities and communities →

Ready for permit-ready MEP plans in San Martin?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in San Martin; requirements vary by project. Confirm with Santa Clara County Department of Planning and Development.