Paso Robles project facts we design around

CountySan Luis Obispo County
Title 24 climate zoneClimate Zone 4, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Paso Robles building department
ADU permits issued, 2021–2025108 (#208 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Paso Robles

Paso Robles issued 108 ADU building permits from 2021 through 2025, the 208th most among the 450 California cities that reported ADU permits. Permits went from 25 in 2021 to 26 in 2025.

20212022202320242025
2523142026

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 4

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.586) / 1000 + 1.21; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,007 sq ft or smaller.

Climate Zone 4 requirements in full →

HVAC design for Paso Robles

The California Energy Commission's design-day data for Paso Robles gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 94°F and a winter design temperature of 16°F.

Summer design (1%)94°F dry bulb / 65°F wet bulb
Winter design (median of extremes)16°F
Daily temperature range44°F
Elevation700 ft
Heating degree days2,885

Heating governs here. Choose a cold-climate heat pump that keeps its rated capacity near 16°F, and protect water lines and the water heater from freezing.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
San Luis ObispoCZ 5Pacific Gas and Electric (PG&E)386
Grover BeachCZ 5Pacific Gas and Electric (PG&E)257
Nipomo (unincorp.)CZ 5Pacific Gas and Electric (PG&E)109
AtascaderoCZ 4Pacific Gas and Electric (PG&E)107
Morro BayCZ 5Pacific Gas and Electric (PG&E)98
Arroyo GrandeCZ 5Pacific Gas and Electric (PG&E)78

San Luis Obispo County → · All California cities and communities →

Ready for permit-ready MEP plans in Paso Robles?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Paso Robles; requirements vary by project. Confirm with the City of Paso Robles building department.