Santa Clara County · Climate Zone 4

MEP Plans in Palo Alto, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Palo Alto, prepared for plan check at the City of Palo Alto building department, with Title 24 available in the same order.

Start My Palo Alto Order See Pricing

Palo Alto project facts we design around

CountySanta Clara County
Title 24 climate zoneClimate Zone 4, confirmed by ZIP for every project
Electric utility (most addresses)City of Palo Alto Utilities
Permit reviewThe City of Palo Alto building department
ADU permits issued, 2021–2025723 (#28 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Palo Alto

Palo Alto issued 723 ADU building permits from 2021 through 2025, the 28th most among the 450 California cities that reported ADU permits. Permits went from 120 in 2021 to 136 in 2025.

20212022202320242025
120120219128136

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 4

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.586) / 1000 + 1.21; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,007 sq ft or smaller.

Climate Zone 4 requirements in full →

HVAC design for Palo Alto

The California Energy Commission's design-day data for Palo Alto gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 83°F and a winter design temperature of 26°F.

Summer design (1%)83°F dry bulb / 64°F wet bulb
Winter design (median of extremes)26°F
Daily temperature range25°F
Elevation25 ft
Heating degree days2,891

Both seasons matter here. The heat pump is usually sized for the 83°F cooling condition and then checked to confirm it still covers the heating load at 26°F.

Electrical service from City of Palo Alto Utilities

If the load calculation shows you need a service upgrade, a second meter or a relocated service, City of Palo Alto Utilities handles that through its Utility Service Application, separately from the building permit.

ADU electrical service with City of Palo Alto Utilities →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
San JoseCZ 4Pacific Gas and Electric (PG&E)2,399
CampbellCZ 4Pacific Gas and Electric (PG&E)1,097
Los GatosCZ 4Pacific Gas and Electric (PG&E)450
SaratogaCZ 4Pacific Gas and Electric (PG&E)387
Los AltosCZ 4Pacific Gas and Electric (PG&E)384
Santa ClaraCZ 4Silicon Valley Power378

Santa Clara County → · All California cities and communities →

Ready for permit-ready MEP plans in Palo Alto?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Palo Alto; requirements vary by project. Confirm with the City of Palo Alto building department.