Monterey County · Climate Zone 4

MEP Plans in King City, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in King City, prepared for plan check at the City of King City building department, with Title 24 available in the same order.

Start My King City Order See Pricing

King City project facts we design around

CountyMonterey County
Title 24 climate zoneClimate Zone 4, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of King City building department
ADU permits issued, 2021–202565 (#271 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in King City

King City issued 65 ADU building permits from 2021 through 2025, the 271st most among the 450 California cities that reported ADU permits. Permits went from 6 in 2022 to 14 in 2025.

20212022202320242025
not reported6192614

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 4

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.586) / 1000 + 1.21; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,007 sq ft or smaller.

Climate Zone 4 requirements in full →

HVAC design for King City

The California Energy Commission's design-day data for King City gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 89°F and a winter design temperature of 20°F.

Summer design (1%)89°F dry bulb / 65°F wet bulb
Winter design (median of extremes)20°F
Daily temperature range36°F
Elevation320 ft
Heating degree days2,639

Heating governs here. Choose a cold-climate heat pump that keeps its rated capacity near 20°F, and protect water lines and the water heater from freezing.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
SalinasCZ 3Pacific Gas and Electric (PG&E)865
MontereyCZ 3Pacific Gas and Electric (PG&E)446
Pacific GroveCZ 3Pacific Gas and Electric (PG&E)218
SeasideCZ 3Pacific Gas and Electric (PG&E)169
Carmel-by-the-SeaCZ 3Pacific Gas and Electric (PG&E)123
SoledadCZ 3Pacific Gas and Electric (PG&E)107

Monterey County → · All California cities and communities →

Ready for permit-ready MEP plans in King City?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in King City; requirements vary by project. Confirm with the City of King City building department.