2025 Energy Code · Climate Zone 2

Title 24 Climate Zone 2: ADU Requirements

What the 2025 California Energy Code's prescriptive package requires for a new detached ADU in Climate Zone 2, and how those requirements change the MEP design.

Order MEP Plans + Title 24 About Title 24 reports

Where Climate Zone 2 is

Of the California places we cover, 36 are mostly in Climate Zone 2, across 5 counties: Lake County, Marin County, Mendocino County, Napa County, Sonoma County. Together they issued 2,243 ADU building permits from 2021 through 2025. Zones follow ZIP-code boundaries, so we confirm the zone from the project address before running the Title 24 report.

2025 prescriptive requirements for a new detached ADU

For a new detached ADU in Climate Zone 2, the 2025 prescriptive package sets these zone-specific targets.

WindowsU-factor 0.27 or lower; SHGC 0.23 or lower; total area up to 20% of floor area (west-facing up to 5%)
Attic, high-performance optionR-38 ceiling; below roof deck: Not required
Attic, ducts-inside optionR-30 ceiling plus radiant barrier; ducts and air handler in conditioned space
Framed wallsAssembly U-factor 0.048 or lower
Cool roofNot required
Whole-house fanNot required
Space heating and coolingHeat pump (other systems through the performance approach)
Water heatingHeat pump water heater; units of 500 sq ft or less, or one bedroom or fewer, have simpler options
Solar PVkW = (floor area x 0.621) / 1000 + 1.22; none required under 1.8 kWdc (about 934 sq ft or smaller for a single ADU)

An attached ADU or a garage conversion is an addition under the Energy Code, not new construction, so it follows the addition requirements instead. Solar PV is not required for additions.

Design temperatures across Climate Zone 2

The zone sets the energy targets, but the HVAC is sized from the local design temperature, and that varies inside a zone. Among the places we cover here, the 1% summer design temperature ranges from 85°F in Novato to 97°F in St. Helena, and the coldest winter design temperature is 18°F in Willits. That spread is why we run a Manual J for each address instead of using a zone-wide rule of thumb.

Places in Climate Zone 2

PlaceCountyElectric utilityADU permits 2021–25
Santa RosaSonomaPacific Gas and Electric (PG&E)497
NapaNapaPacific Gas and Electric (PG&E)303
NovatoMarinPacific Gas and Electric (PG&E)188
San RafaelMarinPacific Gas and Electric (PG&E)157
PetalumaSonomaPacific Gas and Electric (PG&E)124
RossMarinPacific Gas and Electric (PG&E)81
FairfaxMarinPacific Gas and Electric (PG&E)68
San AnselmoMarinPacific Gas and Electric (PG&E)62
St. HelenaNapaPacific Gas and Electric (PG&E)62
SebastopolSonomaPacific Gas and Electric (PG&E)61
SonomaSonomaPacific Gas and Electric (PG&E)57
LarkspurMarinPacific Gas and Electric (PG&E)57
WindsorSonomaPacific Gas and Electric (PG&E)49
HealdsburgSonomaCity of Healdsburg Electric Utility48
American CanyonNapaPacific Gas and Electric (PG&E)45
Rohnert ParkSonomaPacific Gas and Electric (PG&E)43
UkiahMendocinoCity of Ukiah Electric Utility41
Glen Ellen (unincorp.)SonomaPacific Gas and Electric (PG&E)38
Kentfield (unincorp.)MarinPacific Gas and Electric (PG&E)36
CalistogaNapaPacific Gas and Electric (PG&E)27
Kenwood (unincorp.)SonomaPacific Gas and Electric (PG&E)24
CotatiSonomaPacific Gas and Electric (PG&E)19
CloverdaleSonomaPacific Gas and Electric (PG&E)19
Kelseyville (unincorp.)LakePacific Gas and Electric (PG&E)19
WillitsMendocinoPacific Gas and Electric (PG&E)15
YountvilleNapaPacific Gas and Electric (PG&E)13
Guerneville (unincorp.)SonomaPacific Gas and Electric (PG&E)13
Redwood Valley (unincorp.)MendocinoPacific Gas and Electric (PG&E)12
LakeportLakePacific Gas and Electric (PG&E)11
Penngrove (unincorp.)SonomaPacific Gas and Electric (PG&E)11
Hopland (unincorp.)MendocinoPacific Gas and Electric (PG&E)10
Forestville (unincorp.)SonomaPacific Gas and Electric (PG&E)10
Lower Lake (unincorp.)LakePacific Gas and Electric (PG&E)7
Boonville (unincorp.)MendocinoPacific Gas and Electric (PG&E)6
Graton (unincorp.)SonomaPacific Gas and Electric (PG&E)5
Hidden Valley Lake (unincorp.)LakePacific Gas and Electric (PG&E)5

Sources

Requirements shown are the 2025 prescriptive package (effective January 1, 2026) for newly constructed single-family buildings, which includes new detached ADUs. A performance (computer-modeled) approach can trade some items against others. Your Title 24 report confirms what applies to your project.