MEP Plans in Hidden Valley Lake, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Hidden Valley Lake (unincorporated Lake County), prepared for plan check at Lake County Community Development Department – Building & Safety, with Title 24 available in the same order.
Hidden Valley Lake project facts we design around
| County | Lake County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 2, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permits issued by | Lake County Community Development Department – Building & Safety |
| ADU permits issued, 2021–2025 | 5 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Hidden Valley Lake
Lake County issued 5 ADU building permits from 2021 through 2025 for addresses in Hidden Valley Lake, based on the county's reports to the state. Permits went from 1 in 2021 to 1 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 1 | 1 | 1 | 1 | 1 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 2
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Solar PV sized by the CEC formula kW = (floor area x 0.621) / 1000 + 1.22; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 934 sq ft or smaller.
Climate Zone 2 requirements in full →
HVAC design for Hidden Valley Lake
The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 2's North Coast inland climate — warm dry summers, cool winters. Heat pump sized for both heating and cooling seasons.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Kelseyville (unincorp.) | CZ 2 | Pacific Gas and Electric (PG&E) | 19 |
| Lakeport | CZ 2 | Pacific Gas and Electric (PG&E) | 11 |
| Lower Lake (unincorp.) | CZ 2 | Pacific Gas and Electric (PG&E) | 7 |
| Santa Rosa | CZ 2 | Pacific Gas and Electric (PG&E) | 497 |
| Napa | CZ 2 | Pacific Gas and Electric (PG&E) | 303 |
Guides for Hidden Valley Lake projects
Ready for permit-ready MEP plans in Hidden Valley Lake?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Hidden Valley Lake; requirements vary by project. Confirm with Lake County Community Development Department – Building & Safety.