Sonoma County · Climate Zone 2

MEP Plans in Sebastopol, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Sebastopol, prepared for plan check at the City of Sebastopol building department, with Title 24 available in the same order.

Start My Sebastopol Order See Pricing

Sebastopol project facts we design around

CountySonoma County
Title 24 climate zoneClimate Zone 2, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Sebastopol building department
ADU permits issued, 2021–202561 (#277 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Sebastopol

Sebastopol issued 61 ADU building permits from 2021 through 2025, the 277th most among the 450 California cities that reported ADU permits. Permits went from 6 in 2021 to 18 in 2025.

20212022202320242025
617101018

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 2

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.621) / 1000 + 1.22; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 934 sq ft or smaller.

Climate Zone 2 requirements in full →

HVAC design for Sebastopol

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 2's North Coast inland climate — warm dry summers, cool winters. Heat pump sized for both heating and cooling seasons.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Santa RosaCZ 2Pacific Gas and Electric (PG&E)497
PetalumaCZ 2Pacific Gas and Electric (PG&E)124
SonomaCZ 2Pacific Gas and Electric (PG&E)57
WindsorCZ 2Pacific Gas and Electric (PG&E)49
HealdsburgCZ 2City of Healdsburg Electric Utility48
Rohnert ParkCZ 2Pacific Gas and Electric (PG&E)43

Sonoma County → · All California cities and communities →

Ready for permit-ready MEP plans in Sebastopol?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Sebastopol; requirements vary by project. Confirm with the City of Sebastopol building department.