Sonoma County · Climate Zone 2

MEP Plans in Santa Rosa, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Santa Rosa, prepared for plan check at the City of Santa Rosa building department, with Title 24 available in the same order.

Start My Santa Rosa Order See Pricing

Santa Rosa project facts we design around

CountySonoma County
Title 24 climate zoneClimate Zone 2, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Santa Rosa building department
ADU permits issued, 2021–2025497 (#41 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Santa Rosa

Santa Rosa issued 497 ADU building permits from 2021 through 2025, the 41st most among the 450 California cities that reported ADU permits. Permits went from 95 in 2021 to 47 in 2025.

20212022202320242025
951111549047

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 2

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.621) / 1000 + 1.22; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 934 sq ft or smaller.

Climate Zone 2 requirements in full →

HVAC design for Santa Rosa

The California Energy Commission's design-day data for Santa Rosa gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 95°F and a winter design temperature of 24°F.

Summer design (1%)95°F dry bulb / 68°F wet bulb
Winter design (median of extremes)24°F
Daily temperature range35°F
Elevation167 ft
Heating degree days2,980

Both seasons matter here. The heat pump is usually sized for the 95°F cooling condition and then checked to confirm it still covers the heating load at 24°F.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
PetalumaCZ 2Pacific Gas and Electric (PG&E)124
SebastopolCZ 2Pacific Gas and Electric (PG&E)61
SonomaCZ 2Pacific Gas and Electric (PG&E)57
WindsorCZ 2Pacific Gas and Electric (PG&E)49
HealdsburgCZ 2City of Healdsburg Electric Utility48
Rohnert ParkCZ 2Pacific Gas and Electric (PG&E)43

Sonoma County → · All California cities and communities →

Ready for permit-ready MEP plans in Santa Rosa?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Santa Rosa; requirements vary by project. Confirm with the City of Santa Rosa building department.