MEP Plans in Kentfield, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Kentfield (unincorporated Marin County), prepared for plan check at Marin County Community Development Agency – Building and Safety Division, with Title 24 available in the same order.
Kentfield project facts we design around
| County | Marin County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 2, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permits issued by | Marin County Community Development Agency – Building and Safety Division |
| ADU permits issued, 2021–2025 | 36 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Kentfield
Marin County issued 36 ADU building permits from 2021 through 2025 for addresses in Kentfield, based on the county's reports to the state. Permits went from 4 in 2021 to 15 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 4 | 3 | 10 | 4 | 15 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 2
- Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Solar PV sized by the CEC formula kW = (floor area x 0.621) / 1000 + 1.22; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 934 sq ft or smaller.
Climate Zone 2 requirements in full →
HVAC design for Kentfield
The California Energy Commission's design-day data for Kentfield gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 89°F and a winter design temperature of 27°F.
| Summer design (1%) | 89°F dry bulb / 65°F wet bulb |
|---|---|
| Winter design (median of extremes) | 27°F |
| Daily temperature range | 35°F |
| Elevation | 120 ft |
| Heating degree days | 3,009 |
Both seasons matter here. The heat pump is usually sized for the 89°F cooling condition and then checked to confirm it still covers the heating load at 27°F.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Novato | CZ 2 | Pacific Gas and Electric (PG&E) | 188 |
| San Rafael | CZ 2 | Pacific Gas and Electric (PG&E) | 157 |
| Mill Valley | CZ 3 | Pacific Gas and Electric (PG&E) | 112 |
| Ross | CZ 2 | Pacific Gas and Electric (PG&E) | 81 |
| Tiburon | CZ 3 | Pacific Gas and Electric (PG&E) | 78 |
| Fairfax | CZ 2 | Pacific Gas and Electric (PG&E) | 68 |
Guides for Kentfield projects
Ready for permit-ready MEP plans in Kentfield?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Kentfield; requirements vary by project. Confirm with Marin County Community Development Agency – Building and Safety Division.