2025 Energy Code · Climate Zone 13

Title 24 Climate Zone 13: ADU Requirements

What the 2025 California Energy Code's prescriptive package requires for a new detached ADU in Climate Zone 13, and how those requirements change the MEP design.

Order MEP Plans + Title 24 About Title 24 reports

Where Climate Zone 13 is

Of the California places we cover, 29 are mostly in Climate Zone 13, across 5 counties: Fresno County, Kern County, Kings County, Madera County, Tulare County. Together they issued 1,623 ADU building permits from 2021 through 2025. Zones follow ZIP-code boundaries, so we confirm the zone from the project address before running the Title 24 report.

2025 prescriptive requirements for a new detached ADU

For a new detached ADU in Climate Zone 13, the 2025 prescriptive package sets these zone-specific targets.

WindowsU-factor 0.27 or lower; SHGC 0.23 or lower; total area up to 20% of floor area (west-facing up to 5%)
Attic, high-performance optionR-38 ceiling; below roof deck: R-19
Attic, ducts-inside optionR-38 ceiling plus radiant barrier; ducts and air handler in conditioned space
Framed wallsAssembly U-factor 0.048 or lower
Cool roofRequired: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
Whole-house fanRequired, 1.5 cfm per sq ft of floor area (units of 500 sq ft or less exempt)
Space heating and coolingHeat pump (other systems through the performance approach)
Water heatingHeat pump water heater; units of 500 sq ft or less, or one bedroom or fewer, have simpler options
Solar PVkW = (floor area x 0.894) / 1000 + 1.51; none required under 1.8 kWdc (about 324 sq ft or smaller for a single ADU)

An attached ADU or a garage conversion is an addition under the Energy Code, not new construction, so it follows the addition requirements instead. Solar PV is not required for additions.

Design temperatures across Climate Zone 13

The zone sets the energy targets, but the HVAC is sized from the local design temperature, and that varies inside a zone. Among the places we cover here, the 1% summer design temperature ranges from 98°F in Hanford to 101°F in Bakersfield, and the coldest winter design temperature is 19°F in Lemoore. That spread is why we run a Manual J for each address instead of using a zone-wide rule of thumb.

Places in Climate Zone 13

PlaceCountyElectric utilityADU permits 2021–25
BakersfieldKernPacific Gas and Electric (PG&E)296
FresnoFresnoPacific Gas and Electric (PG&E)268
ClovisFresnoPacific Gas and Electric (PG&E)194
VisaliaTulareSouthern California Edison (SCE)118
PortervilleTulareSouthern California Edison (SCE)113
TulareTulareSouthern California Edison (SCE)89
ShafterKernPacific Gas and Electric (PG&E)86
MendotaFresnoPacific Gas and Electric (PG&E)68
DelanoKernSouthern California Edison (SCE)52
HanfordKingsSouthern California Edison (SCE)43
ArvinKernPacific Gas and Electric (PG&E)42
MaderaMaderaPacific Gas and Electric (PG&E)30
LindsayTulareSouthern California Edison (SCE)27
ReedleyFresnoPacific Gas and Electric (PG&E)23
DinubaTularePacific Gas and Electric (PG&E)22
KermanFresnoPacific Gas and Electric (PG&E)16
ParlierFresnoPacific Gas and Electric (PG&E)16
SelmaFresnoPacific Gas and Electric (PG&E)15
FowlerFresnoPacific Gas and Electric (PG&E)14
ChowchillaMaderaPacific Gas and Electric (PG&E)13
LemooreKingsPacific Gas and Electric (PG&E)11
SangerFresnoPacific Gas and Electric (PG&E)11
McFarlandKernPacific Gas and Electric (PG&E)11
Lamont (unincorp.)KernPacific Gas and Electric (PG&E)11
WascoKernPacific Gas and Electric (PG&E)10
KingsburgFresnoPacific Gas and Electric (PG&E)9
CorcoranKingsPacific Gas and Electric (PG&E)5
Orange CoveFresnoPacific Gas and Electric (PG&E)5
ExeterTulareSouthern California Edison (SCE)5

Sources

Requirements shown are the 2025 prescriptive package (effective January 1, 2026) for newly constructed single-family buildings, which includes new detached ADUs. A performance (computer-modeled) approach can trade some items against others. Your Title 24 report confirms what applies to your project.

Need MEP plans and a Title 24 report in Climate Zone 13?

We prepare both from the same design, so the energy model and the equipment on the plans agree.

Start My Order