Tulare County · Climate Zone 13

MEP Plans in Lindsay, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Lindsay, prepared for plan check at the City of Lindsay building department, with Title 24 available in the same order.

Start My Lindsay Order See Pricing

Lindsay project facts we design around

CountyTulare County
Title 24 climate zoneClimate Zone 13, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permit reviewThe City of Lindsay building department
ADU permits issued, 2021–202527 (#336 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Lindsay

Lindsay issued 27 ADU building permits from 2021 through 2025, the 336th most among the 450 California cities that reported ADU permits. Permits went from 3 in 2022 to 10 in 2025.

20212022202320242025
not reported321210

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 13

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
  • Solar PV sized by the CEC formula kW = (floor area x 0.894) / 1000 + 1.51; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 324 sq ft or smaller.

Climate Zone 13 requirements in full →

HVAC design for Lindsay

The California Energy Commission's design-day data for Lindsay gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 100°F and a winter design temperature of 24°F.

Summer design (1%)100°F dry bulb / 71°F wet bulb
Winter design (median of extremes)24°F
Daily temperature range40°F
Elevation395 ft
Heating degree days2,634

Cooling governs equipment size here. At 100°F design conditions, west-facing glass, attic insulation and duct location move the load more than anything else, and the heat pump's electrical load has to be carried into the panel calculation.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
VisaliaCZ 13Southern California Edison (SCE)118
PortervilleCZ 13Southern California Edison (SCE)113
TulareCZ 13Southern California Edison (SCE)89
DinubaCZ 13Pacific Gas and Electric (PG&E)22
ExeterCZ 13Southern California Edison (SCE)5

Tulare County → · All California cities and communities →

Ready for permit-ready MEP plans in Lindsay?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Lindsay; requirements vary by project. Confirm with the City of Lindsay building department.