Tulare County · Climate Zone 13

MEP Plans in Dinuba, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Dinuba, prepared for plan check at the City of Dinuba building department, with Title 24 available in the same order.

Start My Dinuba Order See Pricing

Dinuba project facts we design around

CountyTulare County
Title 24 climate zoneClimate Zone 13, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Dinuba building department
ADU permits issued, 2021–202522 (#351 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Dinuba

Dinuba issued 22 ADU building permits from 2021 through 2025, the 351st most among the 450 California cities that reported ADU permits. Permits went from 10 in 2023 to 8 in 2025.

20212022202320242025
not reportednot reported1048

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 13

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
  • Solar PV sized by the CEC formula kW = (floor area x 0.894) / 1000 + 1.51; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 324 sq ft or smaller.

Climate Zone 13 requirements in full →

HVAC design for Dinuba

The California Energy Commission's design-day data for Dinuba gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 100°F and a winter design temperature of 24°F.

Summer design (1%)100°F dry bulb / 70°F wet bulb
Winter design (median of extremes)24°F
Daily temperature range36°F
Elevation340 ft

Cooling governs equipment size here. At 100°F design conditions, west-facing glass, attic insulation and duct location move the load more than anything else, and the heat pump's electrical load has to be carried into the panel calculation.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
VisaliaCZ 13Southern California Edison (SCE)118
PortervilleCZ 13Southern California Edison (SCE)113
TulareCZ 13Southern California Edison (SCE)89
LindsayCZ 13Southern California Edison (SCE)27
ExeterCZ 13Southern California Edison (SCE)5

Tulare County → · All California cities and communities →

Ready for permit-ready MEP plans in Dinuba?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Dinuba; requirements vary by project. Confirm with the City of Dinuba building department.