Kings County · Climate Zone 13

MEP Plans in Lemoore, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Lemoore, prepared for plan check at the City of Lemoore building department, with Title 24 available in the same order.

Start My Lemoore Order See Pricing

Lemoore project facts we design around

CountyKings County
Title 24 climate zoneClimate Zone 13, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Lemoore building department
ADU permits issued, 2021–202511 (#397 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Lemoore

Lemoore issued 11 ADU building permits from 2021 through 2025, the 397th most among the 450 California cities that reported ADU permits. Permits went from 1 in 2022 to 2 in 2025.

20212022202320242025
not reported1172

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 13

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
  • Solar PV sized by the CEC formula kW = (floor area x 0.894) / 1000 + 1.51; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 324 sq ft or smaller.

Climate Zone 13 requirements in full →

HVAC design for Lemoore

The California Energy Commission's design-day data for Lemoore gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 100°F and a winter design temperature of 19°F.

Summer design (1%)100°F dry bulb / 71°F wet bulb
Winter design (median of extremes)19°F
Daily temperature range37°F
Elevation228 ft
Heating degree days2,960

Heating governs here. Choose a cold-climate heat pump that keeps its rated capacity near 19°F, and protect water lines and the water heater from freezing.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
HanfordCZ 13Southern California Edison (SCE)43
CorcoranCZ 13Pacific Gas and Electric (PG&E)5
ConcordCZ 12Pacific Gas and Electric (PG&E)276
AntiochCZ 12Pacific Gas and Electric (PG&E)171
FairfieldCZ 12Pacific Gas and Electric (PG&E)79

Kings County → · All California cities and communities →

Ready for permit-ready MEP plans in Lemoore?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Lemoore; requirements vary by project. Confirm with the City of Lemoore building department.