San Luis Obispo County · Climate Zone 5

MEP Plans in San Luis Obispo, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in San Luis Obispo, prepared for plan check at the City of San Luis Obispo building department, with Title 24 available in the same order.

Start My San Luis Obispo Order See Pricing

San Luis Obispo project facts we design around

CountySan Luis Obispo County
Title 24 climate zoneClimate Zone 5, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of San Luis Obispo building department
ADU permits issued, 2021–2025386 (#66 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in San Luis Obispo

San Luis Obispo issued 386 ADU building permits from 2021 through 2025, the 66th most among the 450 California cities that reported ADU permits. Permits went from 68 in 2021 to 91 in 2025.

20212022202320242025
6897636791

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 5

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.585) / 1000 + 1.06; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,265 sq ft or smaller.

Climate Zone 5 requirements in full →

HVAC design for San Luis Obispo

The California Energy Commission's design-day data for San Luis Obispo gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 85°F and a winter design temperature of 30°F.

Summer design (1%)85°F dry bulb / 63°F wet bulb
Winter design (median of extremes)30°F
Daily temperature range26°F
Elevation320 ft
Heating degree days2,498

Loads are small in this mild climate, so the common mistake is oversizing. A right-sized heat pump runs longer, quieter cycles and controls humidity better than a rule-of-thumb unit.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Grover BeachCZ 5Pacific Gas and Electric (PG&E)257
Nipomo (unincorp.)CZ 5Pacific Gas and Electric (PG&E)109
Paso RoblesCZ 4Pacific Gas and Electric (PG&E)108
AtascaderoCZ 4Pacific Gas and Electric (PG&E)107
Morro BayCZ 5Pacific Gas and Electric (PG&E)98
Arroyo GrandeCZ 5Pacific Gas and Electric (PG&E)78

San Luis Obispo County → · All California cities and communities →

Ready for permit-ready MEP plans in San Luis Obispo?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in San Luis Obispo; requirements vary by project. Confirm with the City of San Luis Obispo building department.