MEP Plans in San Jacinto, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in San Jacinto, prepared for plan check at the City of San Jacinto building department, with Title 24 available in the same order.
San Jacinto project facts we design around
| County | Riverside County |
|---|---|
| Title 24 climate zone | Climate Zone 10, confirmed by ZIP for every project |
| Electric utility (most addresses) | Southern California Edison (SCE) |
| Permit review | The City of San Jacinto building department |
| ADU permits issued, 2021–2025 | 40 (#319 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in San Jacinto
San Jacinto issued 40 ADU building permits from 2021 through 2025, the 319th most among the 450 California cities that reported ADU permits. Permits went from 2 in 2021 to 19 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 2 | 2 | 4 | 13 | 19 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 10
- Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.
Climate Zone 10 requirements in full →
HVAC design for San Jacinto
The California Energy Commission's design-day data for San Jacinto gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 104°F and a winter design temperature of 20°F.
| Summer design (1%) | 104°F dry bulb / 69°F wet bulb |
|---|---|
| Winter design (median of extremes) | 20°F |
| Daily temperature range | 41°F |
| Elevation | 1,535 ft |
| Heating degree days | 2,376 |
Heating governs here. Choose a cold-climate heat pump that keeps its rated capacity near 20°F, and protect water lines and the water heater from freezing.
Electrical service from Southern California Edison (SCE)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.
ADU electrical service with Southern California Edison (SCE) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Riverside | CZ 10 | Riverside Public Utilities | 1,097 |
| Palm Springs | CZ 15 | Southern California Edison (SCE) | 376 |
| Coachella | CZ 15 | Imperial Irrigation District (IID) | 372 |
| Hemet | CZ 10 | Southern California Edison (SCE) | 317 |
| Moreno Valley | CZ 10 | Southern California Edison (SCE) | 300 |
| Jurupa Valley | CZ 10 | Southern California Edison (SCE) | 284 |
Riverside County → · All California cities and communities →
Guides for San Jacinto projects
Ready for permit-ready MEP plans in San Jacinto?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in San Jacinto; requirements vary by project. Confirm with the City of San Jacinto building department.