Riverside project facts we design around
| County | Riverside County |
|---|---|
| Title 24 climate zone | Climate Zone 10, confirmed by ZIP for every project |
| Electric utility (most addresses) | Riverside Public Utilities |
| Permit review | The City of Riverside building department |
| ADU permits issued, 2021–2025 | 1,097 (#16 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Riverside
Riverside issued 1,097 ADU building permits from 2021 through 2025, the 16th most among the 450 California cities that reported ADU permits. Permits went from 127 in 2021 to 208 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 127 | 178 | 275 | 309 | 208 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 10
- Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.
Climate Zone 10 requirements in full →
HVAC design for Riverside
The California Energy Commission's design-day data for Riverside gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 99°F and a winter design temperature of 27°F.
| Summer design (1%) | 99°F dry bulb / 68°F wet bulb |
|---|---|
| Winter design (median of extremes) | 27°F |
| Daily temperature range | 37°F |
| Elevation | 840 ft |
| Heating degree days | 1,818 |
Both seasons matter here. The heat pump is usually sized for the 99°F cooling condition and then checked to confirm it still covers the heating load at 27°F.
Electrical service from Riverside Public Utilities
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Riverside Public Utilities handles that through its Meter Spot and Electric Service Design process, separately from the building permit.
ADU electrical service with Riverside Public Utilities →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Palm Springs | CZ 15 | Southern California Edison (SCE) | 376 |
| Coachella | CZ 15 | Imperial Irrigation District (IID) | 372 |
| Hemet | CZ 10 | Southern California Edison (SCE) | 317 |
| Moreno Valley | CZ 10 | Southern California Edison (SCE) | 300 |
| Jurupa Valley | CZ 10 | Southern California Edison (SCE) | 284 |
| Corona | CZ 10 | Southern California Edison (SCE) | 256 |
Riverside County → · All California cities and communities →
Guides for Riverside projects
Ready for permit-ready MEP plans in Riverside?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Riverside; requirements vary by project. Confirm with the City of Riverside building department.