Riverside County · Climate Zone 15

MEP Plans in Coachella, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Coachella, prepared for plan check at the City of Coachella building department, with Title 24 available in the same order.

Start My Coachella Order See Pricing

Coachella project facts we design around

CountyRiverside County
Title 24 climate zoneClimate Zone 15, confirmed by ZIP for every project
Electric utility (most addresses)Imperial Irrigation District (IID)
Permit reviewThe City of Coachella building department
ADU permits issued, 2021–2025372 (#72 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Coachella

Coachella issued 372 ADU building permits from 2021 through 2025, the 72nd most among the 450 California cities that reported ADU permits. Permits went from 24 in 2021 to 129 in 2025.

20212022202320242025
24527592129

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 15

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.20 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
  • Solar PV sized by the CEC formula kW = (floor area x 1.56) / 1000 + 1.47; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 212 sq ft or smaller.

Climate Zone 15 requirements in full →

HVAC design for Coachella

The California Energy Commission's design-day data for Coachella gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 109°F and a winter design temperature of 25°F.

Summer design (1%)109°F dry bulb / 73°F wet bulb
Winter design (median of extremes)25°F
Daily temperature range28°F
Elevation-76 ft

Cooling governs equipment size here. At 109°F design conditions, west-facing glass, attic insulation and duct location move the load more than anything else, and the heat pump's electrical load has to be carried into the panel calculation.

Electrical service from Imperial Irrigation District (IID)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, open that request with Imperial Irrigation District (IID) early; utility lead times are often longer than plan check.

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
RiversideCZ 10Riverside Public Utilities1,097
Palm SpringsCZ 15Southern California Edison (SCE)376
HemetCZ 10Southern California Edison (SCE)317
Moreno ValleyCZ 10Southern California Edison (SCE)300
Jurupa ValleyCZ 10Southern California Edison (SCE)284
CoronaCZ 10Southern California Edison (SCE)256

Riverside County → · All California cities and communities →

Ready for permit-ready MEP plans in Coachella?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Coachella; requirements vary by project. Confirm with the City of Coachella building department.