MEP Plans in Kings County, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes anywhere in Kings County, in its cities and in unincorporated areas, with Title 24 available in the same order.
Kings County project facts we design around
| County seat | Hanford |
|---|---|
| Population | 154,913 (Census 2024 estimate) |
| Incorporated cities | 4 |
| Unincorporated residents | About 30,527 (20% of the county) |
| Permits in unincorporated areas | Kings County Community Development Agency |
| Title 24 climate zones | Climate Zone 13. Confirmed by ZIP for every project |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
HVAC design across Kings County
Climate Zone 13: Central Valley-style climate — hot summers, cool winters.
This is a two-sided load: long stretches above 100°F in summer and cold, foggy winter mornings. The heat pump is usually sized for cooling, then checked to make sure it still carries the heating load at the local winter design temperature. High summer peaks also mean the AC is often the single biggest electrical load, which is what pushes many ADUs into a panel or service upgrade.
- Heat pump sized for cooling and verified for winter heating
- Panel / subpanel sizing that accounts for a large cooling load
- Title 24 envelope and HVAC assumptions that hold up in a demanding zone
Unincorporated Kings County
Unincorporated communities are permitted by the county, not by a city. County plan check reviews MEP drawings against the same California Mechanical, Electrical and Plumbing Codes and the Title 24 Energy Code as any city, but the submittal checklist, forms and fees are the county's own, so we prepare the set to match. In rural areas, parcels outside a sewer district often rely on a private septic system; adding an ADU can require the county's environmental health division to confirm the system has capacity, and the plumbing plan then shows the connection to the septic tank instead of a sewer lateral.
What's in a Kings County MEP set
- Mechanical: HVAC layout, Manual J load calculation, equipment schedule, exhaust and whole-unit ventilation
- Electrical: power and lighting plan, panel schedule, NEC 220 load calculation, single-line diagram
- Plumbing: supply and DWV layout, fixture units, water heater, gas (if any), sewer or septic connection
- Title 24 (add-on): energy compliance for your address's climate zone, coordinated with the MEP design so the two documents agree
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. Standard turnaround is 5 business days with two revisions and corrections included.
Kings County cities
| Place | Climate zone | Electric utility |
|---|---|---|
| Corcoran | CZ 13 | Pacific Gas and Electric (PG&E) |
| Hanford | CZ 13 | Southern California Edison (SCE) |
| Lemoore | CZ 13 | Pacific Gas and Electric (PG&E) |
Shown for most addresses in each city. We also serve Kings County's other 1 city and every unincorporated community.
Kings County ADU MEP questions
Who issues building permits for an ADU in unincorporated Kings County?
In unincorporated areas, home to about 30,527 residents (20% of the county), ADU and residential permits go through Kings County Community Development Agency. Inside the county's 4 incorporated cities, that city's own building department reviews the plans instead. We prepare the MEP set for whichever office has jurisdiction over your address.
What Title 24 climate zones are in Kings County?
All of Kings County is in California Climate Zone 13 on the Energy Commission's ZIP-code list. The climate zone drives the Title 24 energy calculation and the HVAC sizing.
Who provides electric service in Kings County?
It depends on the address. In the Kings County places listed on this page, most addresses are served by Pacific Gas and Electric (PG&E) or Southern California Edison (SCE). We confirm the serving utility for every project, because service upgrades and new meters are requested from the utility, separately from the building permit.
How much do ADU MEP plans cost in Kings County?
Our pricing is flat across California: single-discipline ADU plans start at $995, a full MEP package for an ADU up to 600 SF is $2,295, and a Title 24 report can be added for $240. Residential (single-family) full MEP packages start at $3,495. Standard turnaround is 5 business days, and corrections are included.
How long does ADU approval take in Kings County?
California law requires local agencies, counties included, to approve or deny a complete ADU permit application within 60 days. Incomplete or inconsistent drawings are the most common reason the clock restarts, which is why MEP plans that match the architectural set, and a Title 24 report that matches the MEP design, matter.
Guides for Kings County projects
Ready for permit-ready MEP plans in Kings County?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Population figures are Census Bureau 2024 estimates; climate zones are from the California Energy Commission's ZIP-code list, weighted by population. Requirements vary by project: confirm with Kings County Community Development Agency or your city's building department.