Homeland project facts we design around

CountyRiverside County (unincorporated)
Title 24 climate zoneClimate Zone 10, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permits issued byRiverside County Building and Safety Department
ADU permits issued, 2021–202535
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Homeland

Riverside County issued 35 ADU building permits from 2021 through 2025 for addresses in Homeland, based on the county's reports to the state. Permits went from 4 in 2021 to 1 in 2025.

20212022202320242025
4not reported2911

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 10

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.

Climate Zone 10 requirements in full →

HVAC design for Homeland

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 10's inland climate with hot summers. Cooling-driven Manual J with real window orientation and glazing.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
RiversideCZ 10Riverside Public Utilities1,097
Palm SpringsCZ 15Southern California Edison (SCE)376
CoachellaCZ 15Imperial Irrigation District (IID)372
HemetCZ 10Southern California Edison (SCE)317
Moreno ValleyCZ 10Southern California Edison (SCE)300
Jurupa ValleyCZ 10Southern California Edison (SCE)284

Riverside County → · All California cities and communities →

Ready for permit-ready MEP plans in Homeland?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Homeland; requirements vary by project. Confirm with Riverside County Building and Safety Department.