Riverside County · Climate Zone 10

MEP Plans in Eastvale, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Eastvale, prepared for plan check at the City of Eastvale building department, with Title 24 available in the same order.

Start My Eastvale Order See Pricing

Eastvale project facts we design around

CountyRiverside County
Title 24 climate zoneClimate Zone 10, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permit reviewThe City of Eastvale building department
ADU permits issued, 2021–202561 (#278 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Eastvale

Eastvale issued 61 ADU building permits from 2021 through 2025, the 278th most among the 450 California cities that reported ADU permits. Permits went from 14 in 2021 to 15 in 2025.

20212022202320242025
14915815

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 10

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.

Climate Zone 10 requirements in full →

HVAC design for Eastvale

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 10's inland climate with hot summers. Cooling-driven Manual J with real window orientation and glazing.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
RiversideCZ 10Riverside Public Utilities1,097
Palm SpringsCZ 15Southern California Edison (SCE)376
CoachellaCZ 15Imperial Irrigation District (IID)372
HemetCZ 10Southern California Edison (SCE)317
Moreno ValleyCZ 10Southern California Edison (SCE)300
Jurupa ValleyCZ 10Southern California Edison (SCE)284

Riverside County → · All California cities and communities →

Ready for permit-ready MEP plans in Eastvale?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Eastvale; requirements vary by project. Confirm with the City of Eastvale building department.