San Mateo County · Climate Zone 3

MEP Plans in Brisbane, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Brisbane, prepared for plan check at the City of Brisbane building department, with Title 24 available in the same order.

Start My Brisbane Order See Pricing

Brisbane project facts we design around

CountySan Mateo County
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Brisbane building department
ADU permits issued, 2021–202532 (#328 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Brisbane

Brisbane issued 32 ADU building permits from 2021 through 2025, the 328th most among the 450 California cities that reported ADU permits. Permits went from 7 in 2021 to 7 in 2025.

20212022202320242025
77657

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for Brisbane

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 3's mild Bay Area climate. Load calculation on an older service before you assume a panel upgrade (or skip one).

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
San MateoCZ 3Pacific Gas and Electric (PG&E)484
Menlo ParkCZ 3Pacific Gas and Electric (PG&E)398
Redwood CityCZ 3Pacific Gas and Electric (PG&E)354
PacificaCZ 3Pacific Gas and Electric (PG&E)340
HillsboroughCZ 3Pacific Gas and Electric (PG&E)298
South San FranciscoCZ 3Pacific Gas and Electric (PG&E)258

San Mateo County → · All California cities and communities →

Ready for permit-ready MEP plans in Brisbane?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Brisbane; requirements vary by project. Confirm with the City of Brisbane building department.