MEP Plans in Hillsborough, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Hillsborough, prepared for plan check at the City of Hillsborough building department, with Title 24 available in the same order.
Hillsborough project facts we design around
| County | San Mateo County |
|---|---|
| Title 24 climate zone | Climate Zone 3, confirmed by ZIP for every project |
| Electric utility (most addresses) | Pacific Gas and Electric (PG&E) |
| Permit review | The City of Hillsborough building department |
| ADU permits issued, 2021–2025 | 298 (#95 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Hillsborough
Hillsborough issued 298 ADU building permits from 2021 through 2025, the 95th most among the 450 California cities that reported ADU permits. Permits went from 64 in 2021 to 56 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 64 | 84 | 50 | 44 | 56 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 3
- Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
- Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.
Climate Zone 3 requirements in full →
HVAC design for Hillsborough
The California Energy Commission's design-day data for Hillsborough gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 80°F and a winter design temperature of 30°F.
| Summer design (1%) | 80°F dry bulb / 65°F wet bulb |
|---|---|
| Winter design (median of extremes) | 30°F |
| Daily temperature range | 23°F |
| Elevation | 352 ft |
Loads are small in this mild climate, so the common mistake is oversizing. A right-sized heat pump runs longer, quieter cycles and controls humidity better than a rule-of-thumb unit.
Electrical service from Pacific Gas and Electric (PG&E)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.
ADU electrical service with Pacific Gas and Electric (PG&E) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| San Mateo | CZ 3 | Pacific Gas and Electric (PG&E) | 484 |
| Menlo Park | CZ 3 | Pacific Gas and Electric (PG&E) | 398 |
| Redwood City | CZ 3 | Pacific Gas and Electric (PG&E) | 354 |
| Pacifica | CZ 3 | Pacific Gas and Electric (PG&E) | 340 |
| South San Francisco | CZ 3 | Pacific Gas and Electric (PG&E) | 258 |
| Burlingame | CZ 3 | Pacific Gas and Electric (PG&E) | 221 |
San Mateo County → · All California cities and communities →
Guides for Hillsborough projects
Ready for permit-ready MEP plans in Hillsborough?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Hillsborough; requirements vary by project. Confirm with the City of Hillsborough building department.