San Mateo County · Climate Zone 3

MEP Plans in San Mateo, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in San Mateo, prepared for plan check at the City of San Mateo building department, with Title 24 available in the same order.

Start My San Mateo Order See Pricing

San Mateo project facts we design around

CountySan Mateo County
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of San Mateo building department
ADU permits issued, 2021–2025484 (#45 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in San Mateo

San Mateo issued 484 ADU building permits from 2021 through 2025, the 45th most among the 450 California cities that reported ADU permits. Permits went from 68 in 2021 to 151 in 2025.

20212022202320242025
681168366151

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for San Mateo

The California Energy Commission's design-day data for San Mateo gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 82°F and a winter design temperature of 31°F.

Summer design (1%)82°F dry bulb / 65°F wet bulb
Winter design (median of extremes)31°F
Daily temperature range24°F
Elevation21 ft
Heating degree days2,655

Loads are small in this mild climate, so the common mistake is oversizing. A right-sized heat pump runs longer, quieter cycles and controls humidity better than a rule-of-thumb unit.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Menlo ParkCZ 3Pacific Gas and Electric (PG&E)398
Redwood CityCZ 3Pacific Gas and Electric (PG&E)354
PacificaCZ 3Pacific Gas and Electric (PG&E)340
HillsboroughCZ 3Pacific Gas and Electric (PG&E)298
South San FranciscoCZ 3Pacific Gas and Electric (PG&E)258
BurlingameCZ 3Pacific Gas and Electric (PG&E)221

San Mateo County → · All California cities and communities →

Ready for permit-ready MEP plans in San Mateo?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in San Mateo; requirements vary by project. Confirm with the City of San Mateo building department.