MEP Plans in Beaumont, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Beaumont, prepared for plan check at the City of Beaumont building department, with Title 24 available in the same order.
Beaumont project facts we design around
| County | Riverside County |
|---|---|
| Title 24 climate zone | Climate Zone 10, confirmed by ZIP for every project |
| Electric utility (most addresses) | Southern California Edison (SCE) |
| Permit review | The City of Beaumont building department |
| ADU permits issued, 2021–2025 | 24 (#345 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Beaumont
Beaumont issued 24 ADU building permits from 2021 through 2025, the 345th most among the 450 California cities that reported ADU permits. Permits went from 1 in 2021 to 8 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 1 | 2 | 4 | 9 | 8 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 10
- Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.
Climate Zone 10 requirements in full →
HVAC design for Beaumont
The California Energy Commission's design-day data for Beaumont gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 98°F and a winter design temperature of 22°F.
| Summer design (1%) | 98°F dry bulb / 67°F wet bulb |
|---|---|
| Winter design (median of extremes) | 22°F |
| Daily temperature range | 38°F |
| Elevation | 2,605 ft |
| Heating degree days | 2,628 |
Both seasons matter here. The heat pump is usually sized for the 98°F cooling condition and then checked to confirm it still covers the heating load at 22°F.
Electrical service from Southern California Edison (SCE)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.
ADU electrical service with Southern California Edison (SCE) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Riverside | CZ 10 | Riverside Public Utilities | 1,097 |
| Palm Springs | CZ 15 | Southern California Edison (SCE) | 376 |
| Coachella | CZ 15 | Imperial Irrigation District (IID) | 372 |
| Hemet | CZ 10 | Southern California Edison (SCE) | 317 |
| Moreno Valley | CZ 10 | Southern California Edison (SCE) | 300 |
| Jurupa Valley | CZ 10 | Southern California Edison (SCE) | 284 |
Riverside County → · All California cities and communities →
Guides for Beaumont projects
Ready for permit-ready MEP plans in Beaumont?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Beaumont; requirements vary by project. Confirm with the City of Beaumont building department.