2025 Energy Code · Climate Zone 6

Title 24 Climate Zone 6: ADU Requirements

What the 2025 California Energy Code's prescriptive package requires for a new detached ADU in Climate Zone 6, and how those requirements change the MEP design.

Order MEP Plans + Title 24 About Title 24 reports

Where Climate Zone 6 is

Of the California places we cover, 46 are mostly in Climate Zone 6, across 4 counties: Los Angeles County, Orange County, Santa Barbara County, Ventura County. Together they issued 11,363 ADU building permits from 2021 through 2025. Zones follow ZIP-code boundaries, so we confirm the zone from the project address before running the Title 24 report.

2025 prescriptive requirements for a new detached ADU

For a new detached ADU in Climate Zone 6, the 2025 prescriptive package sets these zone-specific targets.

WindowsU-factor 0.30 or lower; SHGC 0.23 or lower; total area up to 20% of floor area (west-facing up to 5%)
Attic, high-performance optionR-30 ceiling; below roof deck: Not required
Attic, ducts-inside optionR-30 ceiling plus radiant barrier; ducts and air handler in conditioned space
Framed wallsAssembly U-factor 0.065 or lower
Cool roofNot required
Whole-house fanNot required
Space heating and coolingHeat pump (other systems through the performance approach)
Water heatingHeat pump water heater; units of 500 sq ft or less, or one bedroom or fewer, have simpler options
Solar PVkW = (floor area x 0.594) / 1000 + 1.23; none required under 1.8 kWdc (about 960 sq ft or smaller for a single ADU)

An attached ADU or a garage conversion is an addition under the Energy Code, not new construction, so it follows the addition requirements instead. Solar PV is not required for additions.

Design temperatures across Climate Zone 6

The zone sets the energy targets, but the HVAC is sized from the local design temperature, and that varies inside a zone. Among the places we cover here, the 1% summer design temperature ranges from 73°F in Avalon to 88°F in Fountain Valley, and the coldest winter design temperature is 29°F in Ventura. That spread is why we run a Manual J for each address instead of using a zone-wide rule of thumb.

Places in Climate Zone 6

PlaceCountyElectric utilityADU permits 2021–25
Long BeachLos AngelesSouthern California Edison (SCE)3,015
OxnardVenturaSouthern California Edison (SCE)1,265
TorranceLos AngelesSouthern California Edison (SCE)1,051
WestminsterOrangeSouthern California Edison (SCE)908
Santa BarbaraSanta BarbaraSouthern California Edison (SCE)683
Santa MonicaLos AngelesSouthern California Edison (SCE)620
Venice (Los Angeles)Los AngelesLos Angeles Department of Water and Power (LADWP)439
Huntington BeachOrangeSouthern California Edison (SCE)437
Laguna BeachOrangeSouthern California Edison (SCE)432
Wilmington (Los Angeles)Los AngelesLos Angeles Department of Water and Power (LADWP)410
San Pedro (Los Angeles)Los AngelesLos Angeles Department of Water and Power (LADWP)393
Costa MesaOrangeSouthern California Edison (SCE)391
Fountain ValleyOrangeSouthern California Edison (SCE)342
VenturaVenturaSouthern California Edison (SCE)249
Newport BeachOrangeSouthern California Edison (SCE)234
Pacific Palisades (Los Angeles)Los AngelesLos Angeles Department of Water and Power (LADWP)226
Redondo BeachLos AngelesSouthern California Edison (SCE)174
CarsonLos AngelesSouthern California Edison (SCE)170
San ClementeOrangeSan Diego Gas & Electric (SDG&E)143
CamarilloVenturaSouthern California Edison (SCE)134
GoletaSanta BarbaraSouthern California Edison (SCE)134
Manhattan BeachLos AngelesSouthern California Edison (SCE)116
Harbor City (Los Angeles)Los AngelesLos Angeles Department of Water and Power (LADWP)111
San Juan CapistranoOrangeSan Diego Gas & Electric (SDG&E)109
El SegundoLos AngelesSouthern California Edison (SCE)105
LomitaLos AngelesSouthern California Edison (SCE)84
Port HuenemeVenturaSouthern California Edison (SCE)73
Rancho Palos VerdesLos AngelesSouthern California Edison (SCE)62
Hermosa BeachLos AngelesSouthern California Edison (SCE)52
Laguna NiguelOrangeSan Diego Gas & Electric (SDG&E)50
Newbury Park (Thousand Oaks)VenturaSouthern California Edison (SCE)50
Signal HillLos AngelesSouthern California Edison (SCE)43
CarpinteriaSanta BarbaraSouthern California Edison (SCE)43
Midway City (unincorp.)OrangeSouthern California Edison (SCE)43
Dana PointOrangeSan Diego Gas & Electric (SDG&E)42
Corona del Mar (Newport Beach)OrangeSouthern California Edison (SCE)40
Rolling Hills EstatesLos AngelesSouthern California Edison (SCE)38
Palos Verdes EstatesLos AngelesSouthern California Edison (SCE)38
Playa del Rey (Los Angeles)Los AngelesLos Angeles Department of Water and Power (LADWP)32
MalibuLos AngelesSouthern California Edison (SCE)29
Capistrano Beach (Dana Point)OrangeSan Diego Gas & Electric (SDG&E)28
Laguna HillsOrangeSan Diego Gas & Electric (SDG&E)22
Seal BeachOrangeSouthern California Edison (SCE)13
Rolling HillsLos AngelesSouthern California Edison (SCE)8
Santa Rosa Valley (unincorp.)VenturaSouthern California Edison (SCE)6
AvalonLos AngelesSouthern California Edison (Catalina Island isolated system)5

Sources

Requirements shown are the 2025 prescriptive package (effective January 1, 2026) for newly constructed single-family buildings, which includes new detached ADUs. A performance (computer-modeled) approach can trade some items against others. Your Title 24 report confirms what applies to your project.

Need MEP plans and a Title 24 report in Climate Zone 6?

We prepare both from the same design, so the energy model and the equipment on the plans agree.

Start My Order