Los Angeles County · Climate Zone 6

MEP Plans in Avalon, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Avalon, prepared for plan check at the City of Avalon building department, with Title 24 available in the same order.

Start My Avalon Order See Pricing

Avalon project facts we design around

CountyLos Angeles County
Title 24 climate zoneClimate Zone 6, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (Catalina Island isolated system)
Permit reviewThe City of Avalon building department
ADU permits issued, 2021–20255 (#414 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Avalon

Avalon issued 5 ADU building permits from 2021 through 2025, the 414th most among the 450 California cities that reported ADU permits. Permits went from 3 in 2022 to 1 in 2025.

20212022202320242025
not reported31not reported1

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 6

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.594) / 1000 + 1.23; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 960 sq ft or smaller.

Climate Zone 6 requirements in full →

HVAC design for Avalon

The California Energy Commission's design-day data for Avalon gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 73°F and a winter design temperature of 37°F.

Summer design (1%)73°F dry bulb / 62°F wet bulb
Winter design (median of extremes)37°F
Daily temperature range11°F
Elevation25 ft
Heating degree days2,204

Loads are small in this mild climate, so the common mistake is oversizing. A right-sized heat pump runs longer, quieter cycles and controls humidity better than a rule-of-thumb unit.

Electrical service from Southern California Edison (Catalina Island isolated system)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, open that request with Southern California Edison (Catalina Island isolated system) early; utility lead times are often longer than plan check.

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Los AngelesCZ 9, 8, 6, 16Los Angeles Department of Water and Power (LADWP)52,059
Long BeachCZ 6, 8Southern California Edison (SCE)3,015
GlendaleCZ 9Glendale Water and Power2,945
BurbankCZ 9Burbank Water and Power1,376
TorranceCZ 6, 8Southern California Edison (SCE)1,051
DowneyCZ 8Southern California Edison (SCE)1,020

Los Angeles County → · All California cities and communities →

Ready for permit-ready MEP plans in Avalon?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Avalon; requirements vary by project. Confirm with the City of Avalon building department.