City of Los Angeles · Climate Zone 6

MEP Plans in Venice, Los Angeles

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Venice (City of Los Angeles), prepared for plan check at Los Angeles Department of Building and Safety (LADBS), with Title 24 available in the same order.

Start My Venice Order See Pricing

Venice project facts we design around

CityCity of Los Angeles
CountyLos Angeles County
Title 24 climate zoneClimate Zone 6, confirmed by ZIP for every project
Electric utility (most addresses)Los Angeles Department of Water and Power (LADWP)
Permit reviewLos Angeles Department of Building and Safety (LADBS)
ADU permits issued, 2021–2025439
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Venice

The City of Los Angeles issued 439 ADU building permits from 2021 through 2025 for addresses in Venice, based on the city's reports to the state. Permits went from 71 in 2021 to 121 in 2025.

20212022202320242025
71858082121

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 6

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Solar PV sized by the CEC formula kW = (floor area x 0.594) / 1000 + 1.23; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 960 sq ft or smaller.

Climate Zone 6 requirements in full →

HVAC design for Venice

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 6's coastal, marine-influenced climate. Right-size the heat pump from a real Manual J instead of a tonnage guess.

Electrical service from Los Angeles Department of Water and Power (LADWP)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Los Angeles Department of Water and Power (LADWP) handles that through its Electric Service Planning, separately from the building permit.

ADU electrical service with Los Angeles Department of Water and Power (LADWP) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
North Hollywood (Los Angeles)CZ 9Los Angeles Department of Water and Power (LADWP)3,130
Van Nuys (Los Angeles)CZ 9Los Angeles Department of Water and Power (LADWP)2,156
Pacoima (Los Angeles)CZ 9Los Angeles Department of Water and Power (LADWP)1,487
Canoga Park (Los Angeles)CZ 9Los Angeles Department of Water and Power (LADWP)1,485
Woodland Hills (Los Angeles)CZ 9Los Angeles Department of Water and Power (LADWP)1,256
Granada Hills (Los Angeles)CZ 9Los Angeles Department of Water and Power (LADWP)1,206

Los Angeles County → · All California cities and communities →

Ready for permit-ready MEP plans in Venice?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Venice; requirements vary by project. Confirm with Los Angeles Department of Building and Safety (LADBS).