Unincorporated Del Norte County · Climate Zone 1

MEP Plans in Smith River, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Smith River (unincorporated Del Norte County), prepared for plan check at Del Norte County Community Development Department – Building Inspection Division, with Title 24 available in the same order.

Start My Smith River Order See Pricing

Smith River project facts we design around

CountyDel Norte County (unincorporated)
Title 24 climate zoneClimate Zone 1, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Power (PacifiCorp)
Permits issued byDel Norte County Community Development Department – Building Inspection Division
ADU permits issued, 2021–202516
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Smith River

Del Norte County issued 16 ADU building permits from 2021 through 2025 for addresses in Smith River, based on the county's reports to the state. Permits went from 2 in 2021 to 4 in 2025.

20212022202320242025
22534

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 1

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.793) / 1000 + 1.27; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 668 sq ft or smaller.

Climate Zone 1 requirements in full →

HVAC design for Smith River

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 1's coastal, marine-influenced climate. Right-size the heat pump from a real Manual J instead of a tonnage guess.

Electrical service from Pacific Power (PacifiCorp)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Power (PacifiCorp) handles that through its Builder Service Request, separately from the building permit.

ADU electrical service with Pacific Power (PacifiCorp) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Crescent CityCZ 1Pacific Power (PacifiCorp)35
Long BeachCZ 6, 8Southern California Edison (SCE)3,015
TorranceCZ 6, 8Southern California Edison (SCE)1,051
Santa MonicaCZ 6Southern California Edison (SCE)620
Huntington BeachCZ 6Southern California Edison (SCE)437

Del Norte County → · All California cities and communities →

Ready for permit-ready MEP plans in Smith River?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Smith River; requirements vary by project. Confirm with Del Norte County Community Development Department – Building Inspection Division.