Del Norte County · Climate Zone 1

MEP Plans in Crescent City, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Crescent City, prepared for plan check at the City of Crescent City building department, with Title 24 available in the same order.

Start My Crescent City Order See Pricing

Crescent City project facts we design around

CountyDel Norte County
Title 24 climate zoneClimate Zone 1, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Power (PacifiCorp)
Permit reviewThe City of Crescent City building department
ADU permits issued, 2021–202535 (#325 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Crescent City

Crescent City issued 35 ADU building permits from 2021 through 2025, the 325th most among the 450 California cities that reported ADU permits. Permits went from 5 in 2022 to 27 in 2024.

20212022202320242025
not reported5327not reported

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 1

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.793) / 1000 + 1.27; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 668 sq ft or smaller.

Climate Zone 1 requirements in full →

HVAC design for Crescent City

The California Energy Commission's design-day data for Crescent City gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 68°F and a winter design temperature of 28°F.

Summer design (1%)68°F dry bulb / 59°F wet bulb
Winter design (median of extremes)28°F
Daily temperature range18°F
Elevation40 ft
Heating degree days4,445

Both seasons matter here. The heat pump is usually sized for the 68°F cooling condition and then checked to confirm it still covers the heating load at 28°F.

Electrical service from Pacific Power (PacifiCorp)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Power (PacifiCorp) handles that through its Builder Service Request, separately from the building permit.

ADU electrical service with Pacific Power (PacifiCorp) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Smith River (unincorp.)CZ 1Pacific Power (PacifiCorp)16
Long BeachCZ 6, 8Southern California Edison (SCE)3,015
TorranceCZ 6, 8Southern California Edison (SCE)1,051
Santa MonicaCZ 6Southern California Edison (SCE)620
Huntington BeachCZ 6Southern California Edison (SCE)437

Del Norte County → · All California cities and communities →

Ready for permit-ready MEP plans in Crescent City?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Crescent City; requirements vary by project. Confirm with the City of Crescent City building department.