Orange County · Climate Zone 8

MEP Plans in Santa Ana, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Santa Ana, prepared for plan check at the City of Santa Ana building department, with Title 24 available in the same order.

Start My Santa Ana Order See Pricing

Santa Ana project facts we design around

CountyOrange County
Title 24 climate zoneClimate Zone 8, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permit reviewThe City of Santa Ana building department
ADU permits issued, 2021–2025956 (#22 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Santa Ana

Santa Ana issued 956 ADU building permits from 2021 through 2025, the 22nd most among the 450 California cities that reported ADU permits. Permits went from 133 in 2021 to 258 in 2025.

20212022202320242025
133170199196258

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 8

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Solar PV sized by the CEC formula kW = (floor area x 0.586) / 1000 + 1.37; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 734 sq ft or smaller.

Climate Zone 8 requirements in full →

HVAC design for Santa Ana

The California Energy Commission's design-day data for Santa Ana gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 89°F and a winter design temperature of 33°F.

Summer design (1%)89°F dry bulb / 68°F wet bulb
Winter design (median of extremes)33°F
Daily temperature range26°F
Elevation115 ft
Heating degree days1,430

Both seasons matter here. The heat pump is usually sized for the 89°F cooling condition and then checked to confirm it still covers the heating load at 33°F.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
FullertonCZ 8Southern California Edison (SCE)2,171
Garden GroveCZ 8, 6Southern California Edison (SCE)2,046
AnaheimCZ 8Anaheim Public Utilities1,713
WestminsterCZ 6Southern California Edison (SCE)908
Huntington BeachCZ 6Southern California Edison (SCE)437
Laguna BeachCZ 6Southern California Edison (SCE)432

Orange County → · All California cities and communities →

Ready for permit-ready MEP plans in Santa Ana?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Santa Ana; requirements vary by project. Confirm with the City of Santa Ana building department.