Los Angeles County · Climate Zone 9

MEP Plans in San Gabriel, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in San Gabriel, prepared for plan check at the City of San Gabriel building department, with Title 24 available in the same order.

Start My San Gabriel Order See Pricing

San Gabriel project facts we design around

CountyLos Angeles County
Title 24 climate zoneClimate Zone 9, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permit reviewThe City of San Gabriel building department
ADU permits issued, 2021–2025328 (#86 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in San Gabriel

San Gabriel issued 328 ADU building permits from 2021 through 2025, the 86th most among the 450 California cities that reported ADU permits. Permits went from 49 in 2021 to 51 in 2025.

20212022202320242025
49586410651

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 9

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.36; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 718 sq ft or smaller.

Climate Zone 9 requirements in full →

HVAC design for San Gabriel

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 9's inland climate with hot summers. Cooling-driven Manual J with real window orientation and glazing.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Los AngelesCZ 9, 8, 6, 16Los Angeles Department of Water and Power (LADWP)52,059
Long BeachCZ 6, 8Southern California Edison (SCE)3,015
GlendaleCZ 9Glendale Water and Power2,945
BurbankCZ 9Burbank Water and Power1,376
TorranceCZ 6, 8Southern California Edison (SCE)1,051
DowneyCZ 8Southern California Edison (SCE)1,020

Los Angeles County → · All California cities and communities →

Ready for permit-ready MEP plans in San Gabriel?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in San Gabriel; requirements vary by project. Confirm with the City of San Gabriel building department.