Los Angeles County · Climate Zone 9

MEP Plans in Burbank, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Burbank, prepared for plan check at the City of Burbank building department, with Title 24 available in the same order.

Start My Burbank Order See Pricing

Burbank project facts we design around

CountyLos Angeles County
Title 24 climate zoneClimate Zone 9, confirmed by ZIP for every project
Electric utility (most addresses)Burbank Water and Power
Permit reviewThe City of Burbank building department
ADU permits issued, 2021–20251,376 (#11 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Burbank

Burbank issued 1,376 ADU building permits from 2021 through 2025, the 11th most among the 450 California cities that reported ADU permits. Permits went from 317 in 2021 to 241 in 2025.

20212022202320242025
317252296270241

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 9

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.36; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 718 sq ft or smaller.

Climate Zone 9 requirements in full →

HVAC design for Burbank

The California Energy Commission's design-day data for Burbank gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 94°F and a winter design temperature of 29°F.

Summer design (1%)94°F dry bulb / 68°F wet bulb
Winter design (median of extremes)29°F
Daily temperature range28°F
Elevation699 ft
Heating degree days1,701

Both seasons matter here. The heat pump is usually sized for the 94°F cooling condition and then checked to confirm it still covers the heating load at 29°F.

Electrical service from Burbank Water and Power

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Burbank Water and Power handles that through its Electric Residential Service Planning, separately from the building permit.

ADU electrical service with Burbank Water and Power →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Los AngelesCZ 9, 8, 6, 16Los Angeles Department of Water and Power (LADWP)52,059
Long BeachCZ 6, 8Southern California Edison (SCE)3,015
GlendaleCZ 9Glendale Water and Power2,945
TorranceCZ 6, 8Southern California Edison (SCE)1,051
DowneyCZ 8Southern California Edison (SCE)1,020
LakewoodCZ 8Southern California Edison (SCE)1,016

Los Angeles County → · All California cities and communities →

Ready for permit-ready MEP plans in Burbank?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Burbank; requirements vary by project. Confirm with the City of Burbank building department.