Los Angeles County · Climate Zone 9

MEP Plans in Monterey Park, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Monterey Park, prepared for plan check at the City of Monterey Park building department, with Title 24 available in the same order.

Start My Monterey Park Order See Pricing

Monterey Park project facts we design around

CountyLos Angeles County
Title 24 climate zoneClimate Zone 9, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permit reviewThe City of Monterey Park building department
ADU permits issued, 2021–2025461 (#47 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Monterey Park

Monterey Park issued 461 ADU building permits from 2021 through 2025, the 47th most among the 450 California cities that reported ADU permits. Permits went from 52 in 2021 to 96 in 2025.

20212022202320242025
521107912496

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 9

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.36; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 718 sq ft or smaller.

Climate Zone 9 requirements in full →

HVAC design for Monterey Park

The California Energy Commission's design-day data for Monterey Park gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 92°F and a winter design temperature of 30°F.

Summer design (1%)92°F dry bulb / 68°F wet bulb
Winter design (median of extremes)30°F
Daily temperature range23°F
Elevation380 ft

Both seasons matter here. The heat pump is usually sized for the 92°F cooling condition and then checked to confirm it still covers the heating load at 30°F.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Los AngelesCZ 9, 8, 6, 16Los Angeles Department of Water and Power (LADWP)52,059
Long BeachCZ 6, 8Southern California Edison (SCE)3,015
GlendaleCZ 9Glendale Water and Power2,945
BurbankCZ 9Burbank Water and Power1,376
TorranceCZ 6, 8Southern California Edison (SCE)1,051
DowneyCZ 8Southern California Edison (SCE)1,020

Los Angeles County → · All California cities and communities →

Ready for permit-ready MEP plans in Monterey Park?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Monterey Park; requirements vary by project. Confirm with the City of Monterey Park building department.