MEP Plans in Bermuda Dunes, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Bermuda Dunes (unincorporated Riverside County), prepared for plan check at Riverside County Building and Safety Department, with Title 24 available in the same order.
Bermuda Dunes project facts we design around
| County | Riverside County (unincorporated) |
|---|---|
| Title 24 climate zone | Climate Zone 15, confirmed by ZIP for every project |
| Electric utility (most addresses) | Imperial Irrigation District (IID) |
| Permits issued by | Riverside County Building and Safety Department |
| ADU permits issued, 2021–2025 | 10 |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Bermuda Dunes
Riverside County issued 10 ADU building permits from 2021 through 2025 for addresses in Bermuda Dunes, based on the county's reports to the state. Permits went from 1 in 2021 to 6 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 1 | not reported | not reported | 3 | 6 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 15
- Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.20 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher; low-sloped roofs 0.63 / 0.75.
- Solar PV sized by the CEC formula kW = (floor area x 1.56) / 1000 + 1.47; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 212 sq ft or smaller.
Climate Zone 15 requirements in full →
HVAC design for Bermuda Dunes
The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 15's high-desert / desert climate with extreme summer heat. Cooling capacity and equipment rated for high outdoor temperatures.
Electrical service from Imperial Irrigation District (IID)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, open that request with Imperial Irrigation District (IID) early; utility lead times are often longer than plan check.
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| Riverside | CZ 10 | Riverside Public Utilities | 1,097 |
| Palm Springs | CZ 15 | Southern California Edison (SCE) | 376 |
| Coachella | CZ 15 | Imperial Irrigation District (IID) | 372 |
| Hemet | CZ 10 | Southern California Edison (SCE) | 317 |
| Moreno Valley | CZ 10 | Southern California Edison (SCE) | 300 |
| Jurupa Valley | CZ 10 | Southern California Edison (SCE) | 284 |
Riverside County → · All California cities and communities →
Guides for Bermuda Dunes projects
Ready for permit-ready MEP plans in Bermuda Dunes?