Unincorporated Marin County · Climate Zone 3

MEP Plans in Stinson Beach, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Stinson Beach (unincorporated Marin County), prepared for plan check at Marin County Community Development Agency – Building and Safety Division, with Title 24 available in the same order.

Start My Stinson Beach Order See Pricing

Stinson Beach project facts we design around

CountyMarin County (unincorporated)
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permits issued byMarin County Community Development Agency – Building and Safety Division
ADU permits issued, 2021–20255
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Stinson Beach

Marin County issued 5 ADU building permits from 2021 through 2025 for addresses in Stinson Beach, based on the county's reports to the state. Permits went from 1 in 2021 to 1 in 2025.

20212022202320242025
1not reportednot reported31

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for Stinson Beach

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 3's mild Bay Area climate. Load calculation on an older service before you assume a panel upgrade (or skip one).

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
NovatoCZ 2Pacific Gas and Electric (PG&E)188
San RafaelCZ 2Pacific Gas and Electric (PG&E)157
Mill ValleyCZ 3Pacific Gas and Electric (PG&E)112
RossCZ 2Pacific Gas and Electric (PG&E)81
TiburonCZ 3Pacific Gas and Electric (PG&E)78
FairfaxCZ 2Pacific Gas and Electric (PG&E)68

Marin County → · All California cities and communities →

Ready for permit-ready MEP plans in Stinson Beach?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Stinson Beach; requirements vary by project. Confirm with Marin County Community Development Agency – Building and Safety Division.