Marin County · Climate Zone 3

MEP Plans in Sausalito, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Sausalito, prepared for plan check at the City of Sausalito building department, with Title 24 available in the same order.

Start My Sausalito Order See Pricing

Sausalito project facts we design around

CountyMarin County
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Sausalito building department
ADU permits issued, 2021–202556 (#287 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Sausalito

Sausalito issued 56 ADU building permits from 2021 through 2025, the 287th most among the 450 California cities that reported ADU permits. Permits went from 9 in 2021 to 7 in 2025.

20212022202320242025
9179147

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for Sausalito

The California Energy Commission's design-day data for Sausalito gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 78°F and a winter design temperature of 30°F.

Summer design (1%)78°F dry bulb / 65°F wet bulb
Winter design (median of extremes)30°F
Daily temperature range12°F
Elevation10 ft

Loads are small in this mild climate, so the common mistake is oversizing. A right-sized heat pump runs longer, quieter cycles and controls humidity better than a rule-of-thumb unit.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
NovatoCZ 2Pacific Gas and Electric (PG&E)188
San RafaelCZ 2Pacific Gas and Electric (PG&E)157
Mill ValleyCZ 3Pacific Gas and Electric (PG&E)112
RossCZ 2Pacific Gas and Electric (PG&E)81
TiburonCZ 3Pacific Gas and Electric (PG&E)78
FairfaxCZ 2Pacific Gas and Electric (PG&E)68

Marin County → · All California cities and communities →

Ready for permit-ready MEP plans in Sausalito?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Sausalito; requirements vary by project. Confirm with the City of Sausalito building department.