MEP Plans in Rancho Cucamonga, CA
Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Rancho Cucamonga, prepared for plan check at the City of Rancho Cucamonga building department, with Title 24 available in the same order.
Rancho Cucamonga project facts we design around
| County | San Bernardino County |
|---|---|
| Title 24 climate zone | Climate Zone 10, confirmed by ZIP for every project |
| Electric utility (most addresses) | Southern California Edison (SCE) |
| Permit review | The City of Rancho Cucamonga building department |
| ADU permits issued, 2021–2025 | 316 (#91 of 450 cities) |
| ADU approval timeline | Approve or deny within 60 days of a complete application (state law) |
ADU building activity in Rancho Cucamonga
Rancho Cucamonga issued 316 ADU building permits from 2021 through 2025, the 91st most among the 450 California cities that reported ADU permits. Permits went from 17 in 2021 to 81 in 2025.
| 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| 17 | 70 | 79 | 69 | 81 |
Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).
Title 24 in Climate Zone 10
- Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
- Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
- Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
- Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.
Climate Zone 10 requirements in full →
HVAC design for Rancho Cucamonga
The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 10's inland climate with hot summers. Cooling-driven Manual J with real window orientation and glazing.
Electrical service from Southern California Edison (SCE)
If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.
ADU electrical service with Southern California Edison (SCE) →
Plumbing and sewer
The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.
Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.
Nearby places compared
| Place | Climate zone | Electric utility | ADU permits 2021–25 |
|---|---|---|---|
| San Bernardino | CZ 10, 16 | Southern California Edison (SCE) | 854 |
| Fontana | CZ 10 | Southern California Edison (SCE) | 754 |
| Ontario | CZ 10 | Southern California Edison (SCE) | 563 |
| Upland | CZ 10 | Southern California Edison (SCE) | 285 |
| Chino | CZ 10 | Southern California Edison (SCE) | 269 |
| Yucaipa | CZ 10 | Southern California Edison (SCE) | 239 |
San Bernardino County → · All California cities and communities →
Guides for Rancho Cucamonga projects
Ready for permit-ready MEP plans in Rancho Cucamonga?
Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.
Start My OrderGeneral guidance, not legal advice. Climate zone and utility are shown for most addresses in Rancho Cucamonga; requirements vary by project. Confirm with the City of Rancho Cucamonga building department.