City of Jurupa Valley · Climate Zone 10

MEP Plans in Mira Loma, Jurupa Valley

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Mira Loma (City of Jurupa Valley), prepared for plan check at the City of Jurupa Valley building department, with Title 24 available in the same order.

Start My Mira Loma Order See Pricing

Mira Loma project facts we design around

CityCity of Jurupa Valley
CountyRiverside County
Title 24 climate zoneClimate Zone 10, confirmed by ZIP for every project
Electric utility (most addresses)Southern California Edison (SCE)
Permit reviewThe City of Jurupa Valley building department
ADU permits issued, 2021–202531
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Mira Loma

The City of Jurupa Valley issued 31 ADU building permits from 2021 through 2025 for addresses in Mira Loma, based on the city's reports to the state. Permits went from 1 in 2021 to 6 in 2025.

20212022202320242025
128146

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 10

  • Windows: U-factor 0.30 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.627) / 1000 + 1.41; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 622 sq ft or smaller.

Climate Zone 10 requirements in full →

HVAC design for Mira Loma

The California Energy Commission's design-day data for Mira Loma gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 99°F and a winter design temperature of 25°F.

Summer design (1%)99°F dry bulb / 68°F wet bulb
Winter design (median of extremes)25°F
Daily temperature range34°F
Elevation700 ft
Heating degree days600

Both seasons matter here. The heat pump is usually sized for the 99°F cooling condition and then checked to confirm it still covers the heating load at 25°F.

Electrical service from Southern California Edison (SCE)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Southern California Edison (SCE) handles that through its Building, Renovation, and Project Planning Portal, separately from the building permit.

ADU electrical service with Southern California Edison (SCE) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Los AngelesCZ 9, 8, 6, 16Los Angeles Department of Water and Power (LADWP)52,059
Santa ClaritaCZ 9, 16Southern California Edison (SCE)175
GlendaleCZ 9Glendale Water and Power2,945
PasadenaCZ 9Pasadena Water and Power932
PomonaCZ 9Southern California Edison (SCE)92

Riverside County → · All California cities and communities →

Ready for permit-ready MEP plans in Mira Loma?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Mira Loma; requirements vary by project. Confirm with the City of Jurupa Valley building department.