Unincorporated Humboldt County · Climate Zone 1

MEP Plans in McKinleyville, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in McKinleyville (unincorporated Humboldt County), prepared for plan check at Humboldt County Planning and Building Department – Building Division, with Title 24 available in the same order.

Start My McKinleyville Order See Pricing

McKinleyville project facts we design around

CountyHumboldt County (unincorporated)
Title 24 climate zoneClimate Zone 1, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permits issued byHumboldt County Planning and Building Department – Building Division
ADU permits issued, 2021–202540
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in McKinleyville

Humboldt County issued 40 ADU building permits from 2021 through 2025 for addresses in McKinleyville, based on the county's reports to the state. Permits went from 14 in 2021 to 3 in 2025.

20212022202320242025
1451173

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 1

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.793) / 1000 + 1.27; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 668 sq ft or smaller.

Climate Zone 1 requirements in full →

HVAC design for McKinleyville

The California Energy Commission's design-day data for McKinleyville gives the outdoor conditions a Manual J load calculation uses: a summer design temperature of 68°F and a winter design temperature of 28°F.

Summer design (1%)68°F dry bulb / 59°F wet bulb
Winter design (median of extremes)28°F
Daily temperature range11°F
Elevation33 ft
Heating degree days1,995

Both seasons matter here. The heat pump is usually sized for the 68°F cooling condition and then checked to confirm it still covers the heating load at 28°F.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
EurekaCZ 1Pacific Gas and Electric (PG&E)166
ArcataCZ 1Pacific Gas and Electric (PG&E)74
FortunaCZ 1Pacific Gas and Electric (PG&E)17
FerndaleCZ 1Pacific Gas and Electric (PG&E)13
Blue LakeCZ 1Pacific Gas and Electric (PG&E)6
Rio DellCZ 1Pacific Gas and Electric (PG&E)5

Humboldt County → · All California cities and communities →

Ready for permit-ready MEP plans in McKinleyville?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in McKinleyville; requirements vary by project. Confirm with Humboldt County Planning and Building Department – Building Division.