Unincorporated Contra Costa County · Climate Zone 3

MEP Plans in Kensington, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Kensington (unincorporated Contra Costa County), prepared for plan check at Contra Costa County Department of Conservation and Development – Building Inspection Division, with Title 24 available in the same order.

Start My Kensington Order See Pricing

Kensington project facts we design around

CountyContra Costa County (unincorporated)
Title 24 climate zoneClimate Zone 3, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permits issued byContra Costa County Department of Conservation and Development – Building Inspection Division
ADU permits issued, 2021–202531
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Kensington

Contra Costa County issued 31 ADU building permits from 2021 through 2025 for addresses in Kensington, based on the county's reports to the state. Permits went from 4 in 2021 to 7 in 2025.

20212022202320242025
46687

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 3

  • Windows: U-factor 0.27 or lower (no SHGC limit in this zone), with total window area up to 20% of floor area.
  • Solar PV sized by the CEC formula kW = (floor area x 0.628) / 1000 + 1.12; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 1,083 sq ft or smaller.

Climate Zone 3 requirements in full →

HVAC design for Kensington

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 3's mild Bay Area climate. Load calculation on an older service before you assume a panel upgrade (or skip one).

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral or septic system. Some Bay Area cities also have private sewer lateral inspection rules, so ask whether your project triggers one.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
RichmondCZ 3Pacific Gas and Electric (PG&E)417
ConcordCZ 12Pacific Gas and Electric (PG&E)276
Alamo (unincorp.)CZ 12Pacific Gas and Electric (PG&E)219
AntiochCZ 12Pacific Gas and Electric (PG&E)171
LafayetteCZ 12Pacific Gas and Electric (PG&E)171
Pleasant HillCZ 12Pacific Gas and Electric (PG&E)152

Contra Costa County → · All California cities and communities →

Ready for permit-ready MEP plans in Kensington?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Kensington; requirements vary by project. Confirm with Contra Costa County Department of Conservation and Development – Building Inspection Division.