Merced County · Climate Zone 12

MEP Plans in Gustine, CA

Permit-ready mechanical, electrical and plumbing plans for ADUs, garage conversions, additions and single-family homes in Gustine, prepared for plan check at the City of Gustine building department, with Title 24 available in the same order.

Start My Gustine Order See Pricing

Gustine project facts we design around

CountyMerced County
Title 24 climate zoneClimate Zone 12, confirmed by ZIP for every project
Electric utility (most addresses)Pacific Gas and Electric (PG&E)
Permit reviewThe City of Gustine building department
ADU permits issued, 2021–202512 (#387 of 450 cities)
ADU approval timelineApprove or deny within 60 days of a complete application (state law)

ADU building activity in Gustine

Gustine issued 12 ADU building permits from 2021 through 2025, the 387th most among the 450 California cities that reported ADU permits. Permits went from 7 in 2021 to 4 in 2025.

20212022202320242025
7not reportednot reported14

Source: California Department of Housing and Community Development, Annual Progress Report data (ADU building permits by year).

Title 24 in Climate Zone 12

  • Windows: U-factor 0.27 or lower and solar heat gain coefficient (SHGC) 0.23 or lower, with total window area up to 20% of floor area (west-facing up to 5%).
  • Whole-house fan required (at least 1.5 cfm per square foot of floor area); units of 500 sq ft or less are exempt.
  • Cool roof required: steep-sloped roofs need aged solar reflectance 0.2 or higher and thermal emittance 0.75 or higher.
  • Solar PV sized by the CEC formula kW = (floor area x 0.613) / 1000 + 1.4; no PV is required if that is under 1.8 kWdc, which for a single ADU works out to about 653 sq ft or smaller.

Climate Zone 12 requirements in full →

HVAC design for Gustine

The HVAC is sized from a room-by-room Manual J using the outdoor design conditions for the address, in Climate Zone 12's Central Valley-style climate — hot summers, cool winters. Heat pump sized for cooling and verified for winter heating.

Electrical service from Pacific Gas and Electric (PG&E)

If the load calculation shows you need a service upgrade, a second meter or a relocated service, Pacific Gas and Electric (PG&E) handles that through its Your Projects portal, separately from the building permit.

ADU electrical service with Pacific Gas and Electric (PG&E) →

Plumbing and sewer

The plumbing plan shows the route, slope and cleanouts of the connection to the existing sewer lateral.

Pricing is flat statewide: ADU plans from $995, full ADU MEP package from $2,295, Title 24 add-on $240. See what's in a complete ADU MEP set.

Nearby places compared

PlaceClimate zoneElectric utilityADU permits 2021–25
Los BanosCZ 12Pacific Gas and Electric (PG&E)84
MercedCZ 12Pacific Gas and Electric (PG&E)25
LivingstonCZ 12Pacific Gas and Electric (PG&E)13
ConcordCZ 12Pacific Gas and Electric (PG&E)276
AntiochCZ 12Pacific Gas and Electric (PG&E)171

Merced County → · All California cities and communities →

Ready for permit-ready MEP plans in Gustine?

Upload your architectural plans, get an instant flat price, and receive PDF plans in about 5 business days.

Start My Order

General guidance, not legal advice. Climate zone and utility are shown for most addresses in Gustine; requirements vary by project. Confirm with the City of Gustine building department.